CASE STUDY 04 • ELEVATOR SERVICES • SPARE PARTS

Building a Connected Service and Spare Parts Management System for a Maharashtra Elevator Installation & Maintenance Company

Asset & AMC intelligence → service operations integration → spare-parts control

₹28 crore annual turnover52 employees · 36 field technicians 1,450 lifts under active AMC540 active spare-part SKUs 72 active suppliers1 central store + 2 service depots 6 Maharashtra service districts~165 service tickets / month 17,400 PM visits / year
Annual addressable economic leakage₹132.00LOpportunity identified · not guaranteed cash recovery
Annualized integration benefit₹100.50LModeled contribution protected and operating costs avoided
Total monthly operating value₹9.33LIntegration equivalent + additional monthly exception value
Productive capacity recovered170 hrsPer month · approximately 1.13 FTE equivalent annualized
Gross chargeable service billing protected₹34.29LGross billable value · ₹24.00L contribution is included once in the integration benefit
Gross AMC contract value protected₹18.75LGross contract value · ₹9.00L contribution is included once in the integration benefit
Candidate working-capital release₹32.00LSeparate from operating benefit · not profit or guaranteed cash
Connected elevator service operations hero visual showing a modern elevator lobby, service facility, controller cabinet, organized spare-parts storage and modeled business outcomes

Executive summary

CASE OVERVIEW

A growing elevator installation and maintenance business had built a substantial installed base across residential, commercial and institutional buildings. Revenue came from annual maintenance contracts (AMCs), new installations, modernization projects and chargeable repairs. However, its service lifecycle was recorded across separate asset lists, spreadsheets, phone and WhatsApp conversations, service sheets, store ledgers, purchase records and warranty files.

The issue was not the absence of data. The business had data, but it was not consistently connected by asset, customer contract, service ticket, technician, spare part, supplier and invoice. Management could not reliably see which lifts were due for preventive maintenance, which tickets were breaching SLA, whether a technician had the right part, whether an issued part was returned or billed, or whether a warranty recovery had been pursued.

THE OUTCOME

The diagnostic identifies ₹132.00 lakh in annual economic leakage opportunity across eight streams: unbilled chargeable service, warranty recovery, repeat visits, emergency parts, inventory loss, PM/SLA exceptions, routing inefficiency and AMC renewal contribution at risk.

A connected operating layer around the current accounting and service processes is modeled to capture ₹100.50 lakh in annual benefit at steady state. That is equivalent to ₹8.375 lakh/month. A separate assumption of ₹0.95 lakh/month in additional new value from exceptions resolved under ongoing monitoring brings total monthly operating value to ₹9.325 lakh, shown as ₹9.33 lakh/month.

The scenario separately models ₹34.29 lakh in gross chargeable service billing protected, with ₹24.00 lakh contribution counted once in the annual integration benefit; and ₹18.75 lakh in gross AMC contract value protected, with ₹9.00 lakh contribution counted once in that same benefit. A further ₹32.00 lakh candidate working-capital release is kept outside the operating-benefit calculation.

The model also recovers 170 working hours per month, or 2,040 hours per year, approximately 1.13 FTE of productive capacity. This is capacity released, not an assumed payroll saving or headcount reduction.

Service control

Connect each asset and AMC to service requests, priority, SLA timestamps, technician allocation, work completion and customer acknowledgement.

Parts discipline

Connect criticality, stock by location, reservations, issues, returns, approved procurement references and warranty evidence.

Commercial visibility

Validate chargeable work against contract scope, parts consumed, customer approval, rate card and invoice completeness; monitor AMC renewal exposure.

STAGE 01 · COMPANY PROFILE

The business at a glance

OPERATING CONTEXT

An SME-scale elevator installation and maintenance operator with a sizeable managed lift base, field service workload and multi-location spare-parts needs, but not necessarily a nationwide enterprise service platform.

IndustryElevator services

Installation, maintenance, modernization and chargeable repairs

Annual turnover₹28 crore

Employees52

Including 36 field technicians

Service coordinators5

Planning and service coordination

Managed service base1,450 lifts

Under active AMC

Spare parts540 SKUs

Active spare-part catalogue

Supplier base72

Approved / active suppliers

Operating network3 locations

1 central store + 2 service depots

Geographic coverage6 districts

Maharashtra service districts

Service tickets1,980 / year

Approximately 165 per month

Preventive maintenance17,400 / year

1,450 managed lifts × 12 scheduled visits

Revenue modelFour streams

AMC, installations, modernization and chargeable work

Annual revenue mix

₹28.00 CRORE
Revenue streamAnnual revenueCommercial definition
Annual maintenance contracts₹12.2 croreRecurring service contract revenue
New installation projects₹7.0 croreNew lift installation and commissioning
Modernization₹4.6 croreUpgrade and replacement projects
Chargeable repairs / spare parts₹4.2 croreNon-AMC repair work and customer-pay parts
Total annual turnover₹28.0 crore
STAGE 02 · BUSINESS SITUATION

How the business operated before the transformation

CURRENT STATE

Each service event may involve an asset and building, AMC contract and scope, service request, priority and SLA clock, technician assignment, spare-part reservation or issue, work-completion record, customer acknowledgement, chargeability decision, invoice or warranty claim. Before integration, these records were held in separate departmental tools and files.

Asset / AMC→Service request→Ticket / SLA→Technician dispatch→Part reservation / issue→Work completion→Return / reconciliation→Billing / warranty→Customer outcome
Information areaBefore-state patternOperational consequence
Asset / AMC registerLift details, site, contract tier, renewal date and service history in separate lists.Hard to reconcile installed base, coverage and renewal pipeline.
Service requestsPhone, WhatsApp, paper and spreadsheet ticket entries.Duplicate records, incomplete fields and weak SLA visibility.
Technician allocationDispatcher knowledge and calls; limited central capacity view.Uneven territory loading, repeat trips and avoidable idle time.
Spare partsSeparate SKU lists, store ledgers and purchase files.Parts unavailable at dispatch; over-issue and emergency buying.
Preventive maintenanceManual calendars and completion follow-up.Missed service windows and weak completion evidence.
Warranty / chargeable workSeparate evidence folders and invoice notes.Recovery and billing gaps remain open longer than necessary.
Management reportingManual consolidation across service, stores and finance.Delayed view of cost, service and customer contract exposure.
Disconnected elevator service and spare-parts information flow: service intake, paper sheets, AMC spreadsheet, technician diary, store ledger, procurement, warranty and billing records without common identifiers
Elevator service operations — disconnected information flow · Asset, ticket, parts, warranty, AMC and billing records were not consistently connected by common identifiers.

The operating footprint is intentionally SME-scale: one main store, two service depots, 36 field technicians and a five-person coordination/planning group. The scenario assumes an existing accounting platform and spreadsheet-based records rather than a large enterprise field-service platform. The proposed design is a bounded data and workflow integration around existing processes.

STAGE 03 · CRITICAL BUSINESS PROBLEMS

The core service and spare-parts management problems

NINE PROBLEM AREAS

The primary problem was fragmented service operations: management could not connect the installed asset and contract to the service event, technician action, spare-part movement, warranty entitlement, chargeability and customer outcome.

01

Asset and AMC identifiers

Lift and contract records lacked consistent identifiers, fragmenting service history across building names, equipment references, customer contacts and AMC files.

02

Unstructured service intake

Requests arrived through several channels, with priority, response clock, fault family, work performed and customer sign-off not consistently captured.

03

Dispatcher-dependent allocation

District, skill, workload, open tickets, travel time and part availability were not considered together in a repeatable allocation queue.

04

Inconsistent spare-part visibility

Part descriptions and stock positions varied across stores; technicians could be dispatched without the right part while slow-moving stock remained elsewhere.

05

Unlinked parts issue and return

Standard quantity, actual quantity, approval, unused return and chargeable status were difficult to reconcile to the ticket and asset.

06

PM and SLA control gaps

Preventive-maintenance scheduling was not consistently connected to completion evidence, due windows, SLA escalation and contract renewal risk.

07

Fragmented warranty evidence

Warranty and supplier-recovery evidence was spread across purchase records, part details, service reports and claim correspondence.

08

Chargeable-work validation

Work could be completed without a consistent pre-invoice check linking scope, customer approval, parts consumed, contract exclusions and billing evidence.

09

Manual management reporting

Manual reconciliation reduced time available for root-cause analysis, service planning and account-level action.

The platform is an information and workflow layer. It does not make engineering judgments or decide whether any equipment is safe to operate.
STAGE 04 · OBSTACLE ANALYSIS

What prevented management from resolving these problems

ROOT CAUSES & CONTROL NEEDS

These management and data barriers explain why local fixes did not create an end-to-end service view. Each obstacle requires a control that can be owned and evidenced across functions.

Missing asset / contract / ticket identifiers

Root cause: Separate lists and inconsistent reference fields.

Function: Service operations and data ownership.

Consequence: Service events cannot be reliably traced to asset, site, scope and history.

Control: Common asset, building, AMC and ticket keys with controlled exception mapping.

Fragmented service-request intake

Root cause: Phone, WhatsApp, paper and spreadsheet records use different fields and timestamps.

Function: Service coordination.

Consequence: Duplicate requests and weak acknowledgement / response SLA visibility.

Control: Structured ticket capture with priority, timestamps, asset lookup and closure evidence.

Limited technician workload and travel visibility

Root cause: Allocation depends heavily on dispatcher knowledge and separate diaries.

Function: Dispatch and field service.

Consequence: Uneven district loading, repeat trips, idle gaps and avoidable overtime.

Control: Dispatcher-assisted allocation by district, skill, open workload and part availability.

Inconsistent spare-part master and stock records

Root cause: Different SKU descriptions, approved references and location balances.

Function: Stores and procurement.

Consequence: Unreliable availability, emergency buying and dormant stock.

Control: Standard part catalogue, criticality, min/max, location mapping and reservation logic.

Unlinked parts issue / return

Root cause: Standard, issued, fitted and returned quantities are not reconciled to one ticket.

Function: Stores and service technicians.

Consequence: Over-issue, unexplained variance and billing disputes.

Control: Ticket-linked issue, authorization, fitted quantity and unused-return reconciliation.

Weak PM due-window and completion tracking

Root cause: Manual calendars and disconnected completion records.

Function: Service planning and contract operations.

Consequence: Missed windows, weak proof and customer / SLA exposure.

Control: PM due-window calendar, overdue queue, completion evidence and account-level escalation.

Warranty evidence spread across files

Root cause: Claim, purchase, serial/lot and diagnosis records are not linked.

Function: Procurement, service and finance.

Consequence: Eligible claims age or are missed, and recoveries may not be recognized correctly.

Control: Warranty register with evidence, submission, supplier response and credit status.

Missing contract-scope and chargeability checks

Root cause: AMC exclusions, approval, consumed parts, rate card and invoice are separate.

Function: Service operations and finance / billing.

Consequence: Completed chargeable work can remain unbilled or disputed.

Control: Ticket-to-contract-to-invoice validation before billing close.

Manual reporting and unclear ownership

Root cause: Cross-functional data is reconciled periodically without one shared exception definition.

Function: Management and department process owners.

Consequence: Repeat exceptions persist and management action is delayed.

Control: Owner-based dashboard, due action, escalation and evidence-linked monthly value ledger.

STAGE 05 · BASELINE DATASET

The evidence base — records used in the diagnostic

SAMPLE POPULATIONS & CONTROL TOTALS

The workbook uses sample-level records that mirror evidence an elevator-service SME could reasonably assemble. It also contains explicit full-population KPI control totals and a separate assumption-driven financial opportunity bridge.

Dataset / evidence classcoverageWhat it supports
Asset / AMC master300 sample assets from a 1,450-lift managed baseAsset IDs, district, lift class, age, AMC tier, annual contract value, renewal month and assigned technician.
Spare-parts catalogue180 sample SKUs from a 540-SKU cataloguePart family, average cost, lead time, min/max levels, criticality and supplier link.
Service ticket sample250 baseline + 125 post records; KPI control populations 1,980 / 990Ticket type, priority, response SLA, first-visit fix, revisit, resolution, part, chargeability and technician.
PM visit sample240 baseline + 120 post records; KPI control populations 17,400 / 8,700Scheduled versus completed service-window control, visit category and technician.
Parts consumption sample240 baseline + 120 post rowsStandard versus issued quantity, over-issue, authorization and returned quantity.
Inventory snapshot sample360 SKU-location positions per periodBook / physical quantity, age, value, criticality, availability and accuracy.
Procurement sample120 baseline + 60 post receiptsReference price, actual price, variance, emergency flag and lead time.
Warranty claims80 recordsEligible, claimed, recovered and unrecovered amounts.
Admin time studySix comparable workflow categories520 baseline versus 350 post hours per month.

Transaction-like sample rows

Illustrative subsets used to demonstrate record matching, evidence fields and workflow analysis. They are not the full company database or independently verified operating records.

KPI control populations

scenario counters used for before-and-after KPI denominators. The workbook's control totals are separate from the sample row counts.

STAGE 06 · DIAGNOSTIC INVESTIGATION

How the diagnostic was conducted

NINE EVIDENCE TESTS

The modeled diagnostic connects records by asset, ticket, technician, part, supplier, store, contract and customer where identifiers are available. Financial opportunity is tested separately from the operational KPI bridge.

Diagnostic workstreamComparison / testEvidence required in a live audit
Asset and AMC completenessCompare active lift base, contract dates, service tier, price, site and visit entitlement.Signed AMC, asset plate/reference, service history, customer master and renewal records.
Ticket / SLA integrityCompare channel intake, duplicate call, priority, acknowledgement, dispatch, arrival and closure.Ticket log, call timestamps, contract SLA, technician assignment and customer acknowledgement.
First-time fix / repeat visitCompare repeat tickets for the same asset/fault within an agreed window.Linked service history, fault family, parts used, technician notes and closure evidence.
Spare-part availabilityCompare ticket demand with available-to-promise stock by location and criticality.SKU master, stock snapshots, reservations, min/max, open POs and transfer records.
Parts issue and returnCompare standard / allowed quantity, issue, fitted quantity, unused return and ticket closure.Material issue slip, technician consumption record, store receipt and work order.
Procurement premiumCompare actual purchase price with matched approved reference price for identical specifications.PO, supplier invoice, part specification, quantity, freight and urgency reason.
Warranty / recoveryCompare eligible claims with claims submitted, accepted and credited.Purchase / warranty terms, serial/lot details, service diagnosis, claim submission and credit note.
Chargeable work billingCompare work completed and parts consumed with contract scope and invoice.AMC exclusions, customer approval, job completion, rate card, invoice and receipt.
PM completion and renewalsCompare due visits with completed visits and link service quality to renewal exposure.PM plan, completed visit proof, SLA credits, renewal dates and contract margin.
In a live engagement, no leakage amount should enter a realized-value ledger until the transaction, contractual entitlement, technical eligibility, responsible owner and supporting evidence have been validated.
STAGE 07 · FINDINGS, ROOT CAUSE AND SEVERITY

Eight sources of annual addressable economic leakage

₹132.00L TOTAL

The eight modeled opportunity streams total ₹132.00 lakh per year. Capture assumptions produce ₹100.50 lakh in annualized integration benefit at steady state. Priority classifications are qualitative scenario priorities, not independent risk ratings.

01 · COMMERCIAL CONTROL

Unbilled chargeable repairs and spare parts

Critical · source prioritization

Root cause: Completed repairs and parts consumption were not consistently joined to AMC scope, exclusions, customer approval, rate card and invoice status.

Business effect: Chargeable work can remain unbilled or disputed after service completion.

₹30.00L opportunity80% capture₹24.00L benefit

Control: Ticket-to-contract-to-invoice validation, rate cards, approval and pre-invoice exceptions.

Evidence boundary: ₹42.86L gross billable gap × 70% contribution margin = ₹30L contribution pool. Capture contribution only.

02 · WARRANTY RECOVERY

Warranty / supplier recovery gaps

High · source prioritization

Root cause: Warranty and supplier-recovery evidence was not tracked from eligibility through submission, supplier response and credit.

Business effect: Recoverable value can age or be missed; claim value is not cash until accepted and credited.

₹12.00L opportunity75% capture₹9.00L benefit

Control: Claims register linked to part, asset, supplier, purchase and job evidence.

Evidence boundary: Eligible amount after contract, proof and supplier acceptance. Recognize recovery only after documentary acceptance or credit.

03 · SERVICE QUALITY

Repeat visits / first-time-fix rework

High · source prioritization

Root cause: Fault and service history, parts availability, technician notes and repeat-call reasons were not consistently linked.

Business effect: Revisit labour, vehicle and handling costs can persist when first-visit resolution is weak.

₹20.00L opportunity75% capture₹15.00L benefit

Control: Fault / part history, availability by location, reservation and pre-dispatch checks.

Evidence boundary: Incremental revisit labour, vehicle and handling; parts already counted elsewhere are excluded. Route-only idle travel is treated separately.

04 · PROCUREMENT

Emergency spare procurement and freight premiums

High · source prioritization

Root cause: Critical-part availability, replenishment thresholds, lead times and comparable purchase references were not visible together.

Business effect: Emergency purchase and freight premiums can rise when normal replenishment or transfers are not triggered early enough.

₹18.00L opportunity75% capture₹13.50L benefit

Control: Criticality-based min/max, approved supplier references, reorder alerts and transfer visibility.

Evidence boundary: Matched part specification, approved price and comparable freight; normalize genuine urgency and specification differences.

05 · INVENTORY CONTROL

Spare over-issue, variance and dormant-stock loss

High · source prioritization

Root cause: Standard versus actual issue, authorization, fitted quantity, unused return and location balances were not reliably reconciled.

Business effect: Excess issues and unexplained variance can create loss, while low-use stock can tie up cash in the wrong location.

₹16.00L opportunity75% capture₹12.00L benefit

Control: Ticket-linked standard / actual issue, return, cycle-count, redeployment and stop-buy controls.

Evidence boundary: Excess issue and unexplained variance net of returns / redeployment. Working-capital release is kept separate.

06 · PM / SLA CONTROL

Missed PM windows and SLA service credits

High · source prioritization

Root cause: Due dates, completion evidence, overdue reasons and contract-specific SLA exceptions were not surfaced in one accountable workflow.

Business effect: Avoidable credits, deductions and directly attributable service costs can increase customer and contract exposure.

₹12.00L opportunity75% capture₹9.00L benefit

Control: Due-date calendar, overdue queue, proof of completion and account-level escalation.

Evidence boundary: Count only avoidable credits, deductions and directly attributable costs; verify the contract SLA and service evidence.

07 · TECHNICIAN UTILIZATION

Technician routing and overtime inefficiency

Medium · source prioritization

Root cause: District routing, travel gaps, open workload and overtime allocation depended on manual dispatcher knowledge.

Business effect: Non-revisit travel inefficiency, idle gaps and avoidable overtime can reduce available field capacity.

₹12.00L opportunity75% capture₹9.00L benefit

Control: Dispatcher-assisted allocation and route-exception reporting by district, skill and workload.

Evidence boundary: Exclude repeat-visit costs counted in the first-time-fix stream. Use approved route, attendance and overtime evidence.

08 · CUSTOMER / AMC VALUE

AMC renewal contribution at risk

Medium · source prioritization

Root cause: Service history, repeat calls, PM completion, customer outcomes and renewal dates were not connected in one renewal-risk view.

Business effect: Contract renewal contribution can be at risk when service-quality issues are not visible early enough for account action.

₹12.00L opportunity75% capture₹9.00L benefit

Control: Service history, PM completion, repeat-call indicators and renewal-risk dashboard.

Evidence boundary: Contribution component of ₹25L gross AMC contract value at risk; 48% contribution-margin assumption.

Leakage streamAnnual opportunityCapture assumptionAnnual integration benefit
Unbilled chargeable repairs / parts₹30.00L80%₹24.00L
Warranty / supplier recovery₹12.00L75%₹9.00L
Repeat visits / first-time-fix rework₹20.00L75%₹15.00L
Emergency spare procurement / freight₹18.00L75%₹13.50L
Spare over-issue / variance / dormant stock₹16.00L75%₹12.00L
Missed PM windows / SLA credits₹12.00L75%₹9.00L
Technician routing / overtime₹12.00L75%₹9.00L
AMC renewal contribution at risk₹12.00L75%₹9.00L
TOTAL₹132.00L76.1% weighted₹100.50L
Eight-stream annual elevator service leakage waterfall totaling ₹132 lakh in opportunity and ₹100.50 lakh in modeled captured benefit
Annual leakage opportunity waterfall · Gross chargeable billing, gross AMC contract value and working capital are excluded from the ₹132L opportunity pool.
STAGE 08 · INTERACTIVE FINANCIAL OPPORTUNITY EXPLORER

From service leakage to measurable operating value

EIGHT SELECTABLE STREAMS

The native explorer is the interactive companion. Select an opportunity stream to inspect its financial pool, capture assumption, root cause, business effect, calculation basis, control and evidence boundary.

Financial Opportunity ExplorerSELECT A VIEW AND A LEAKAGE STREAM
Annual addressable opportunity₹132.00L
Annualized integration benefit₹100.50L
Weighted modeled capture76.1%
₹132.00L
Annual addressable economic opportunity · not guaranteed cash recovery
01 · UNBILLED CHARGEABLE REPAIRS / PARTS

Unbilled chargeable repairs and spare parts

Opportunity ₹30.00LCapture 80%Benefit ₹24.00L

Root cause

Completed repairs and parts consumption were not consistently joined to AMC scope, customer approval, rate card and invoice status.

Business effect

Chargeable work can remain unbilled or disputed after service completion.

Calculation basis

₹42.86L gross billable gap × 70% contribution margin = ₹30.00L contribution pool; × 80% capture = ₹24.00L.

Control introduced

Ticket-to-contract-to-invoice validation, rate cards, approval and pre-invoice exceptions.

Evidence boundary

Count contribution only after scope, evidence, customer approval, rate card and invoice checks. Gross billing remains a separate disclosure.

The ₹132.00L is an annual addressable opportunity pool, not cash already recovered. Modeled capture across all eight streams produces ₹100.50L in annualized integration benefit.
₹8.375L / monthMonthly integration-benefit equivalent · ₹100.50L divided by 12
₹0.95L / monthAdditional modeled value from new exceptions resolved under monitoring
₹9.325L / monthTotal monthly operating value monitored · approximately ₹9.33L
₹9.325L/month includes the ₹8.375L/month integration-benefit equivalent. It is not an independent additional benefit on top of ₹100.50L annualized integration benefit. The additional ₹0.95L/month is a separate modeled exception-resolution assumption.
STAGE 09 · GROSS REVENUE AND CONTRIBUTION BOUNDARIES

Protecting billable service value and AMC contribution

GROSS VALUE ≠ CONTRIBUTION

Chargeable service revenue and AMC contract value are shown separately from their contribution components. Only the modeled contribution values below are included once in the ₹100.50L annualized integration benefit.

Gross chargeable billable gap₹42.86L70% contribution margin produces a ₹30.00L contribution opportunity.
Estimated gross service billing protected₹34.29L80% modeled capture of gross billable value.
Contribution protected₹24.00LIncluded once in the ₹100.50L annual integration benefit.
Gross AMC contract value at risk₹25.00L48% contribution margin produces a ₹12.00L contribution opportunity.
Estimated gross AMC value protected₹18.75L75% modeled capture of gross contract value.
AMC contribution protected₹9.00LIncluded once in the ₹100.50L annual integration benefit.
No double counting: ₹34.29L gross chargeable service billing and ₹18.75L gross AMC contract value are not profit and are not added to the integration-benefit total. Their contribution components of ₹24.00L and ₹9.00L are already counted once within the ₹100.50L benefit.
STAGE 10 · CONNECTED SERVICE ARCHITECTURE

Building a connected service and spare-parts operating environment

TARGET STATE

The solution is an SME-scale integration and operating-control layer. It can use existing accounting exports, spreadsheets and approved interfaces as source systems. It does not require an enterprise-wide platform replacement or autonomous control of elevator equipment.

Connected elevator service control architecture linking asset and AMC master, service ticket, SLA, technician allocation, parts availability, work completion, parts consumption and return, chargeable billing, warranty, customer reporting and management intelligence
Connected service and spare-parts architecture · Common asset, building, AMC, ticket, technician, SKU, supplier and invoice references connect the operating lifecycle.
01

Asset and contract source

One asset / customer / contract reference.

  • Asset ID and building
  • Lift type and location
  • AMC tier and scope
  • SLA, renewal and history
02

Service request and ticket

Structured service-event capture.

  • Request intake and asset lookup
  • Priority and SLA clock
  • Symptom and job status
  • Closure evidence
03

Dispatch and field execution

Dispatcher-assisted allocation visibility.

  • Technician availability
  • Territory and skill tags
  • Open workload and priority
  • Part reservation visibility
04

Spare-parts and inventory

Stock linked to the service requirement.

  • SKU and approved references
  • Criticality and location
  • Min/max and lead time
  • Issue, return and consumption
05

PM and warranty workflows

Scheduled work and eligible claims.

  • PM calendar and due windows
  • Completion proof and overdue alerts
  • Warranty eligibility
  • Claim ageing and status
06

Commercial control

Validate work before billing and renewal review.

  • AMC scope and exclusions
  • Chargeable approval
  • Parts consumed and rate card
  • Invoice completeness
07

Management intelligence

Owner-led performance and exception views.

  • Daily open-ticket / SLA view
  • Weekly PM / inventory exceptions
  • Monthly value ledger
  • AMC renewal dashboard
↺

Exception feedback loop

Validated outcomes feed operating rules.

  • Overdue alerts
  • Reorder thresholds
  • Claim ageing
  • Renewal risk and owner actions
This architecture supports records, prioritization, scheduling visibility and exception monitoring. It is not an enterprise platform replacement, lift-control system, autonomous equipment manager or safety-certification platform.
IMPLEMENTATION METHODOLOGY

From asset master to controlled service deployment

INDICATIVE 12-WEEK PLAN

The six-phase sequence stabilizes asset and spare-part data first, then connects service and inventory events, and finally introduces management reporting and value tracking. This is an indicative schedule, not a guarantee for every real customer.

PHASE 01WEEKS 1–2

Discover and baseline

Confirm service processes, asset / AMC sources, ticket channels, SKU catalogue, store locations, source owners, definitions and evidence rules.

Deliverable: Process map and baseline register.
Exit: Signed baseline, source-to-metric map and prioritized backlog.
Owner: Service operations owner.
PHASE 02WEEKS 3–4

Master-data foundation

Normalize asset IDs, customer/site references, AMC scope, part codes, criticality, approved suppliers, min/max and store mappings.

Deliverable: Validated asset / AMC and parts masters.
Exit: Reconciliation and data exception log.
Owner: Data steward with store owner.
PHASE 03WEEKS 5–6

Service and PM workflow

Configure structured ticket fields, ticket status, SLA timestamps, PM due windows, overdue alerts, technician assignment queue and closure proof.

Deliverable: Ticket and PM workflows.
Exit: UAT for intake, dispatch and PM workflows.
Owner: Service operations owner.
PHASE 04WEEKS 7–8

Parts and commercial controls

Connect reservation, issue / return, procurement receipts, reorder alerts, warranty evidence, chargeable-work approval and pre-invoice checks.

Deliverable: Parts, warranty and billing registers.
Exit: Reconciled parts flow, exception queue and billing test pack.
Owner: Store owner and Finance / billing owner.
PHASE 05WEEKS 9–10

Reporting and pilot

Build service, SLA, PM, inventory, warranty, billing and renewal dashboards; pilot with selected districts and depots.

Deliverable: Management views and pilot rhythm.
Exit: Dashboard sign-off, data-quality checks and defect log.
Owner: Departmental process owners.
PHASE 06WEEKS 11–12

Deployment and value tracking

Configure role-based access, release SOPs, orient users, go live with owner escalation and conduct the first benefits review.

Deliverable: Go-live pack, SOPs and monthly value ledger.
Exit: Go-live sign-off and 30-day action plan.
Owner: Service operations owner with Mantis Predict delivery lead.

Core implementation deliverables

  • Asset and AMC master with unique identifiers, contractual scope and renewal dates.
  • Spare-part catalogue with standard descriptions, criticality, approved references, replenishment parameters and supplier lead times.
  • Structured ticket workflow with severity, SLA timestamps, assigned technician, part reservation, work-completion record and billing / warranty pathway.
  • Preventive-maintenance calendar with due windows, overdue tasks, completion evidence and account-level exceptions.

Parts, claims and management deliverables

  • Parts issue, return and consumption controls linked to ticket / asset; purchase receipts, emergency-order flags and stock availability by location.
  • Warranty and chargeable-work registers with evidence links, claim / billing status and ageing.
  • Management dashboard and monthly value-realization ledger separating gross billings, contribution, avoided cost, working capital and capacity.

Adoption and governance ownership

A named service operations owner, store owner, Finance / billing owner and data steward should own the workflows. Departmental process owners manage exception resolution and escalation; the Mantis Predict delivery lead coordinates integration, validation, operating definitions and value reporting. Role-based access, documented exception ownership and SOP adoption are required. No training statistics or team-working-photo claims are made in this scenario.

STAGE 11 · OPERATIONAL RESULTS

Service quality, parts availability and productivity

TEN KPIs

The post-intervention scorecard compares control totals and direct time measures. Rate improvements are expressed as percentage-point changes; time and workload changes remain in their own units.

Before-and-after elevator service performance dashboard showing first-visit fix, revisit, response SLA, PM completion, critical spare availability, inventory accuracy, AMC renewal, ticket resolution and emergency response
Before-and-after service performance dashboard · Static visual summary; the native interactive explorer below provides definitions, denominators and measurement boundaries.
MeasureBeforeAfter / monitored stateChangeInterpretation
First-visit fix rate68.0%85.1%+17.1 ppMore calls resolved without a repeat visit.
Revisit incidence32.0%15.1%−16.9 ppFewer tickets require another visit.
Response SLA compliance81.0%95.1%+14.1 ppBetter visibility into response deadlines and escalation.
PM visits completed within window82.0%95.0%+13.0 ppMore scheduled visits completed in the agreed window.
Critical spare availability87.1%96.0%+8.9 ppHigher availability across critical SKU-location combinations.
Inventory record accuracy91.2%98.5%+7.3 ppImproved agreement between book and sample count.
AMC renewal rate84.0%92.0%+8.0 ppImproved renewal visibility and follow-up.
Average ticket resolution18.5 hours9.2 hours9.3 hours fasterFaster ticket closure in the modeled sample.
Average emergency response5.6 hours2.7 hours2.9 hours fasterImproved dispatch and priority visibility.
Process / admin effort520 h/month350 h/month170 h/month freed1.13 FTE equivalent capacity per year; not automatic payroll savings.
Service-ticket populations: 1,980 baseline / 990 post; first-time fixes 1,346 / 842; revisit tickets 634 / 149; SLA-compliant responses 1,604 / 941. PM: 14,268 of 17,400 baseline and 8,265 of 8,700 post visits completed within window. Critical spare availability: 392 / 450 and 432 / 450. Inventory accuracy: 2,280 / 2,500 and 2,463 / 2,500 sample lines. AMC renewals: 1,218 / 1,450 and 1,334 / 1,450. Sample and control boundaries remain distinct.
NATIVE INTERACTIVE COMPANION

Operational Performance Explorer

TEN SELECTABLE MEASURES

Select any KPI to inspect its baseline, post result, correct unit, supported denominator and interpretation. Percentage measures use percentage bars; time and effort measures use separate time scales. Shorter bars indicate improvement for lower-is-better measures.

Operational KPI ExplorerSELECT A MEASURE · BASELINE VS. POST
Group A · Service quality and response
Group B · PM and spare-parts control
Group C · Customer and productivity outcomes
SERVICE QUALITY

First-visit fix rate

Share of service tickets resolved on the first visit.

Baseline · Jan–Dec 202568.0%
Post · Jan–Jun 202685.1%
+17.1 percentage points

Sample / denominator: 1,346 / 1,980 baseline tickets; 842 / 990 post tickets.

BASELINE VS. POST · SCALE 0–100%
68.0%
85.1%
Higher is better · rate measure
Baseline effort520 hrs/mo.
Post effort350 hrs/mo.
Capacity recovered170 hrs/mo.
Annual / FTE equivalent2,040 hrs · 1.13 FTE
WorkflowBaseline h/monthPost h/monthHours recovered / month
Service ticket creation and closure1257550
PM planning and follow-up955540
Parts issue, return and reconciliation955540
Warranty / AMC claim administration705515
Technician allocation and route changes806515
Management reporting and reconciliation554510
TOTAL520350170
Capacity is not automatic cash saving: 170 hours/month × 12 = 2,040 hours/year. At 1,800 annual working hours per FTE, this is approximately 1.13 FTE equivalent capacity. The workflow hours above already include reporting and reconciliation; do not add those activities again.
MANAGEMENT INTELLIGENCE · NATIVE HTML DASHBOARD

One operating view across service, parts and customer contracts

INTERACTIVE MANAGEMENT VIEW

The dashboard connects operating outcomes to the signals, ownership and review actions that management needs. Select a panel to inspect the relevant indicators and controls. This is a native scenario view, not a live service-management system.

MANTIS PREDICT / CASE 04Elevator service operations intelligence

Connected asset, AMC, ticket, technician, spare-parts, warranty and billing view

SCENARIO
MODELLED POST STATE · NOT LIVE SERVICE DATA
Annual leakage opportunity₹132.00L
Annual integration benefit₹100.50L
Monthly operating value₹9.33L
Capacity recovered170 hrs
SERVICE PERFORMANCE

Protect the response and first-visit service outcome

Link ticket intake to asset history, priority, contract SLA, technician assignment, work completion and repeat-call cause so service leaders can see where resolution is delayed.

First-visit fix 68.0% → 85.1% · response SLA 81.0% → 95.1%
Management signalOpen ticket age, response SLA exceptions, repeat-call incidence, resolution time and customer acknowledgement.
Accountable ownerService operations owner and service coordination lead.
Review actionDaily high-priority and SLA review; weekly first-visit fix and repeat-ticket root-cause review.
All displayed values are scenario outputs. Functional tabs describe management measures and exception workflows, not live incidents or an actual production system. Queue identifiers, ageing and closure evidence are populated from approved source records in a real deployment.
ExceptionAsset / ticket / part referenceDepartment / ownerPriorityAgeing basisNext actionClosure evidence
High-priority ticket / response SLA riskAsset ID + ticket IDService coordination / service operations ownerHighElapsed time from request / acknowledgement against contract SLAValidate ticket priority, acknowledge and assign dispatcher / technicianTimestamped acknowledgement, dispatch and customer status
PM visit outside agreed service windowAsset ID + AMC IDService planning / PM coordinatorHighElapsed time from contracted PM due windowConfirm visit status, completion proof and follow-up ownerCompleted PM record and customer acknowledgement
Critical spare below min / max thresholdSKU ID + store / depot IDStores / store ownerHighElapsed time since threshold breach or stock-out alertCheck ticket reservations, inter-depot availability and open POCount, transfer, approved PO or replenishment receipt
Parts issue / return mismatchTicket ID + SKU IDStores and service / process ownerHighElapsed time since work completion or return due dateReconcile issued, fitted and unused-return quantitiesAuthorized issue record, technician consumption and store receipt
Warranty / supplier claim awaiting responsePart serial / lot + claim IDProcurement / warranty administratorHighElapsed time since eligibility or claim submissionValidate claim pack and follow up supplier responseAccepted claim, supplier credit or documented rejection
Completed chargeable work not matched to invoiceTicket ID + AMC / contract IDFinance / billing ownerCriticalElapsed time since job completion and approvalCheck contract scope, exclusions, customer approval, rate card and partsInvoice reference or documented contractual exclusion
AMC renewal risk requiring account reviewAsset ID + AMC IDCustomer / contract ownerMediumTime remaining to contract renewal dateReview PM completion, repeat calls and service history with account ownerRecorded renewal decision and customer follow-up
Illustrative queue schema only. The table does not represent actual open incidents, specific assets, tickets, ages or current closure states. In a live implementation, IDs, owners, timestamps, priority and status are populated from approved source records.
SPARE-PARTS AVAILABILITY AND WORKING CAPITAL

Critical-part availability and inventory discipline

540 SKUs · 3 LOCATIONS

Parts control connects criticality, stock location, service-ticket reservation, issue and return, replenishment parameters and approved supplier lead times. The goal is to make required parts visible before dispatch while keeping stock levels and redeployment decisions evidence-led.

Spare-parts control infographic showing 540 active spare SKUs, three stock locations, critical spare availability 87.1 to 96.0 percent, inventory record accuracy 91.2 to 98.5 percent, and candidate working-capital release shown separately
Critical spare availability and inventory discipline across one central store and two service depots. Candidate working-capital release is shown separately from operating benefit.
Candidate one-time working-capital release₹32.00LModeled action estimate from stock redeployment, returns, transfers and stop-buy actions.

The ₹32.00L amount is a candidate liquidity release, not operating profit, revenue or guaranteed cash. Dormant stock is not automatically obsolete or a loss. Each action needs SKU criticality, age, condition, demand, transfer compatibility, approved part reference and supplier return-term validation.

SKU criticalityClassify critical, important and normal parts against service demand.
Min / max stockSet replenishment thresholds with approved supplier lead times.
Ticket reservationReserve stock for scheduled or approved service work.
Inter-depot transferReview available stock across all three locations before emergency buying.
Unused part returnReconcile issued, fitted and returned quantities to each job.
Ageing / stop-buyValidate demand and condition before redeployment, supplier return or purchase deferral.
The ₹32.00L working-capital candidate is excluded from the ₹132.00L annual opportunity, ₹100.50L integration benefit and ₹9.325L monthly monitored operating value. Stock ageing by itself does not establish obsolescence or cash release.
ONGOING SERVICE INTELLIGENCE

Ongoing service intelligence and continuous improvement

PROPOSED OPERATING CADENCE

The ongoing operating model is more than software support. It is a recurring service, inventory, commercial and management-control rhythm that keeps exceptions visible as the installed base, parts catalogue, supplier terms, technician capacity and customer contracts change.

Daily / near-real-time

Protect active service delivery

  • High-priority service tickets.
  • Response SLA breaches.
  • Critical-part stock-outs.
  • Overdue PM work.
  • Open repeat-call tickets.
  • Parts unavailable for scheduled work.
  • Chargeable-work approval exceptions.
  • Unsubmitted warranty claims where evidence is available.
Weekly

Resolve recurring operational exceptions

  • Technician workload and district coverage.
  • Repeat tickets and parts consumption exceptions.
  • Emergency purchase and warranty claim ageing.
  • PM completion and overdue work.
  • Stock transfers and unresolved service exceptions.
Monthly

Review performance and value

  • Service margin and chargeable billing completeness.
  • Warranty / supplier recovery.
  • AMC renewal pipeline.
  • Inventory health and spare availability.
  • SLA performance and exception closure.
  • Evidence-linked monthly value ledger.
Quarterly

Refresh operating rules

  • Critical-part parameters and min/max levels.
  • Service-process definitions and escalation rules.
  • Dashboard owners and recurring exceptions.
  • AMC renewal / service-risk indicators.
  • Technician allocation and district workload.
  • SOPs and control thresholds.
Gross billingsChargeable work invoiced, shown separately.
ContributionEligible contribution protected, counted once.
Avoided costVerified reduction in operating cost or recovery.
Working capitalLiquidity movement, separate from P&L.
CapacityHours released, not automatic payroll savings.
NATIVE MONTHLY OPERATING-VALUE BRIDGE

Value maintained through integration and new exceptions resolved

MONTHLY OPERATING VALUE

The monthly view keeps the integration benefit equivalent separate from the additional modeled value generated by new exceptions resolved under ongoing monitoring.

₹8.375LMonthly integration-benefit equivalent
₹100.50L annualized ÷ 12
₹0.95LAdditional monthly value from new exceptions resolved under monitoring
₹9.325LTotal monthly operating value monitored · approximately ₹9.33L
The ₹9.325L monthly total includes the ₹8.375L integration-benefit equivalent. It is not an independent benefit on top of ₹100.50L annualized integration benefit. The additional ₹0.95L is a separate assumption, to be supported by a monthly evidence-linked value ledger.
CUSTOMER SERVICE AND PRODUCTIVITY OUTCOMES

Customer service outcomes and capacity returned to the business

CONCLUDING RESULTS
Elevator service outcomes infographic showing first-visit fix plus 17.1 percentage points, PM completion plus 13.0 points, response SLA plus 14.1 points, AMC renewal plus 8.0 points, faster ticket and emergency response, and 170 hours monthly productive capacity recovered
Customer service, AMC and productivity outcomes · 170 hours/month equals 2,040 hours/year and approximately 1.13 FTE equivalent capacity.

The connected operating model provides management with a clearer connection between service performance, preventive maintenance, parts readiness, warranty and chargeable-work evidence, AMC renewal visibility and the administrative effort involved in running the service operation.

BUILD A MORE CONNECTED SERVICE OPERATION

Start with an asset, service and spare-parts operating diagnostic

Understand where service visibility, parts availability, PM control, warranty recovery and chargeable-work processes are constraining performance—and what a connected operating model could improve.

Book a 20-Min Call →