Building a Connected Service and Spare Parts Management System for a Maharashtra Elevator Installation & Maintenance Company
Asset & AMC intelligence → service operations integration → spare-parts control
Executive summary
A growing elevator installation and maintenance business had built a substantial installed base across residential, commercial and institutional buildings. Revenue came from annual maintenance contracts (AMCs), new installations, modernization projects and chargeable repairs. However, its service lifecycle was recorded across separate asset lists, spreadsheets, phone and WhatsApp conversations, service sheets, store ledgers, purchase records and warranty files.
The issue was not the absence of data. The business had data, but it was not consistently connected by asset, customer contract, service ticket, technician, spare part, supplier and invoice. Management could not reliably see which lifts were due for preventive maintenance, which tickets were breaching SLA, whether a technician had the right part, whether an issued part was returned or billed, or whether a warranty recovery had been pursued.
The diagnostic identifies ₹132.00 lakh in annual economic leakage opportunity across eight streams: unbilled chargeable service, warranty recovery, repeat visits, emergency parts, inventory loss, PM/SLA exceptions, routing inefficiency and AMC renewal contribution at risk.
A connected operating layer around the current accounting and service processes is modeled to capture ₹100.50 lakh in annual benefit at steady state. That is equivalent to ₹8.375 lakh/month. A separate assumption of ₹0.95 lakh/month in additional new value from exceptions resolved under ongoing monitoring brings total monthly operating value to ₹9.325 lakh, shown as ₹9.33 lakh/month.
The scenario separately models ₹34.29 lakh in gross chargeable service billing protected, with ₹24.00 lakh contribution counted once in the annual integration benefit; and ₹18.75 lakh in gross AMC contract value protected, with ₹9.00 lakh contribution counted once in that same benefit. A further ₹32.00 lakh candidate working-capital release is kept outside the operating-benefit calculation.
The model also recovers 170 working hours per month, or 2,040 hours per year, approximately 1.13 FTE of productive capacity. This is capacity released, not an assumed payroll saving or headcount reduction.
Service control
Connect each asset and AMC to service requests, priority, SLA timestamps, technician allocation, work completion and customer acknowledgement.
Parts discipline
Connect criticality, stock by location, reservations, issues, returns, approved procurement references and warranty evidence.
Commercial visibility
Validate chargeable work against contract scope, parts consumed, customer approval, rate card and invoice completeness; monitor AMC renewal exposure.
The business at a glance
An SME-scale elevator installation and maintenance operator with a sizeable managed lift base, field service workload and multi-location spare-parts needs, but not necessarily a nationwide enterprise service platform.
Installation, maintenance, modernization and chargeable repairs
Including 36 field technicians
Planning and service coordination
Under active AMC
Active spare-part catalogue
Approved / active suppliers
1 central store + 2 service depots
Maharashtra service districts
Approximately 165 per month
1,450 managed lifts × 12 scheduled visits
AMC, installations, modernization and chargeable work
Annual revenue mix
| Revenue stream | Annual revenue | Commercial definition |
|---|---|---|
| Annual maintenance contracts | ₹12.2 crore | Recurring service contract revenue |
| New installation projects | ₹7.0 crore | New lift installation and commissioning |
| Modernization | ₹4.6 crore | Upgrade and replacement projects |
| Chargeable repairs / spare parts | ₹4.2 crore | Non-AMC repair work and customer-pay parts |
| Total annual turnover | ₹28.0 crore |
How the business operated before the transformation
Each service event may involve an asset and building, AMC contract and scope, service request, priority and SLA clock, technician assignment, spare-part reservation or issue, work-completion record, customer acknowledgement, chargeability decision, invoice or warranty claim. Before integration, these records were held in separate departmental tools and files.
| Information area | Before-state pattern | Operational consequence |
|---|---|---|
| Asset / AMC register | Lift details, site, contract tier, renewal date and service history in separate lists. | Hard to reconcile installed base, coverage and renewal pipeline. |
| Service requests | Phone, WhatsApp, paper and spreadsheet ticket entries. | Duplicate records, incomplete fields and weak SLA visibility. |
| Technician allocation | Dispatcher knowledge and calls; limited central capacity view. | Uneven territory loading, repeat trips and avoidable idle time. |
| Spare parts | Separate SKU lists, store ledgers and purchase files. | Parts unavailable at dispatch; over-issue and emergency buying. |
| Preventive maintenance | Manual calendars and completion follow-up. | Missed service windows and weak completion evidence. |
| Warranty / chargeable work | Separate evidence folders and invoice notes. | Recovery and billing gaps remain open longer than necessary. |
| Management reporting | Manual consolidation across service, stores and finance. | Delayed view of cost, service and customer contract exposure. |
The operating footprint is intentionally SME-scale: one main store, two service depots, 36 field technicians and a five-person coordination/planning group. The scenario assumes an existing accounting platform and spreadsheet-based records rather than a large enterprise field-service platform. The proposed design is a bounded data and workflow integration around existing processes.
The core service and spare-parts management problems
The primary problem was fragmented service operations: management could not connect the installed asset and contract to the service event, technician action, spare-part movement, warranty entitlement, chargeability and customer outcome.
Asset and AMC identifiers
Lift and contract records lacked consistent identifiers, fragmenting service history across building names, equipment references, customer contacts and AMC files.
Unstructured service intake
Requests arrived through several channels, with priority, response clock, fault family, work performed and customer sign-off not consistently captured.
Dispatcher-dependent allocation
District, skill, workload, open tickets, travel time and part availability were not considered together in a repeatable allocation queue.
Inconsistent spare-part visibility
Part descriptions and stock positions varied across stores; technicians could be dispatched without the right part while slow-moving stock remained elsewhere.
Unlinked parts issue and return
Standard quantity, actual quantity, approval, unused return and chargeable status were difficult to reconcile to the ticket and asset.
PM and SLA control gaps
Preventive-maintenance scheduling was not consistently connected to completion evidence, due windows, SLA escalation and contract renewal risk.
Fragmented warranty evidence
Warranty and supplier-recovery evidence was spread across purchase records, part details, service reports and claim correspondence.
Chargeable-work validation
Work could be completed without a consistent pre-invoice check linking scope, customer approval, parts consumed, contract exclusions and billing evidence.
Manual management reporting
Manual reconciliation reduced time available for root-cause analysis, service planning and account-level action.
What prevented management from resolving these problems
These management and data barriers explain why local fixes did not create an end-to-end service view. Each obstacle requires a control that can be owned and evidenced across functions.
Missing asset / contract / ticket identifiers
Root cause: Separate lists and inconsistent reference fields.
Function: Service operations and data ownership.
Consequence: Service events cannot be reliably traced to asset, site, scope and history.
Control: Common asset, building, AMC and ticket keys with controlled exception mapping.
Fragmented service-request intake
Root cause: Phone, WhatsApp, paper and spreadsheet records use different fields and timestamps.
Function: Service coordination.
Consequence: Duplicate requests and weak acknowledgement / response SLA visibility.
Control: Structured ticket capture with priority, timestamps, asset lookup and closure evidence.
Limited technician workload and travel visibility
Root cause: Allocation depends heavily on dispatcher knowledge and separate diaries.
Function: Dispatch and field service.
Consequence: Uneven district loading, repeat trips, idle gaps and avoidable overtime.
Control: Dispatcher-assisted allocation by district, skill, open workload and part availability.
Inconsistent spare-part master and stock records
Root cause: Different SKU descriptions, approved references and location balances.
Function: Stores and procurement.
Consequence: Unreliable availability, emergency buying and dormant stock.
Control: Standard part catalogue, criticality, min/max, location mapping and reservation logic.
Unlinked parts issue / return
Root cause: Standard, issued, fitted and returned quantities are not reconciled to one ticket.
Function: Stores and service technicians.
Consequence: Over-issue, unexplained variance and billing disputes.
Control: Ticket-linked issue, authorization, fitted quantity and unused-return reconciliation.
Weak PM due-window and completion tracking
Root cause: Manual calendars and disconnected completion records.
Function: Service planning and contract operations.
Consequence: Missed windows, weak proof and customer / SLA exposure.
Control: PM due-window calendar, overdue queue, completion evidence and account-level escalation.
Warranty evidence spread across files
Root cause: Claim, purchase, serial/lot and diagnosis records are not linked.
Function: Procurement, service and finance.
Consequence: Eligible claims age or are missed, and recoveries may not be recognized correctly.
Control: Warranty register with evidence, submission, supplier response and credit status.
Missing contract-scope and chargeability checks
Root cause: AMC exclusions, approval, consumed parts, rate card and invoice are separate.
Function: Service operations and finance / billing.
Consequence: Completed chargeable work can remain unbilled or disputed.
Control: Ticket-to-contract-to-invoice validation before billing close.
Manual reporting and unclear ownership
Root cause: Cross-functional data is reconciled periodically without one shared exception definition.
Function: Management and department process owners.
Consequence: Repeat exceptions persist and management action is delayed.
Control: Owner-based dashboard, due action, escalation and evidence-linked monthly value ledger.
The evidence base — records used in the diagnostic
The workbook uses sample-level records that mirror evidence an elevator-service SME could reasonably assemble. It also contains explicit full-population KPI control totals and a separate assumption-driven financial opportunity bridge.
| Dataset / evidence class | coverage | What it supports |
|---|---|---|
| Asset / AMC master | 300 sample assets from a 1,450-lift managed base | Asset IDs, district, lift class, age, AMC tier, annual contract value, renewal month and assigned technician. |
| Spare-parts catalogue | 180 sample SKUs from a 540-SKU catalogue | Part family, average cost, lead time, min/max levels, criticality and supplier link. |
| Service ticket sample | 250 baseline + 125 post records; KPI control populations 1,980 / 990 | Ticket type, priority, response SLA, first-visit fix, revisit, resolution, part, chargeability and technician. |
| PM visit sample | 240 baseline + 120 post records; KPI control populations 17,400 / 8,700 | Scheduled versus completed service-window control, visit category and technician. |
| Parts consumption sample | 240 baseline + 120 post rows | Standard versus issued quantity, over-issue, authorization and returned quantity. |
| Inventory snapshot sample | 360 SKU-location positions per period | Book / physical quantity, age, value, criticality, availability and accuracy. |
| Procurement sample | 120 baseline + 60 post receipts | Reference price, actual price, variance, emergency flag and lead time. |
| Warranty claims | 80 records | Eligible, claimed, recovered and unrecovered amounts. |
| Admin time study | Six comparable workflow categories | 520 baseline versus 350 post hours per month. |
Transaction-like sample rows
Illustrative subsets used to demonstrate record matching, evidence fields and workflow analysis. They are not the full company database or independently verified operating records.
KPI control populations
scenario counters used for before-and-after KPI denominators. The workbook's control totals are separate from the sample row counts.
How the diagnostic was conducted
The modeled diagnostic connects records by asset, ticket, technician, part, supplier, store, contract and customer where identifiers are available. Financial opportunity is tested separately from the operational KPI bridge.
| Diagnostic workstream | Comparison / test | Evidence required in a live audit |
|---|---|---|
| Asset and AMC completeness | Compare active lift base, contract dates, service tier, price, site and visit entitlement. | Signed AMC, asset plate/reference, service history, customer master and renewal records. |
| Ticket / SLA integrity | Compare channel intake, duplicate call, priority, acknowledgement, dispatch, arrival and closure. | Ticket log, call timestamps, contract SLA, technician assignment and customer acknowledgement. |
| First-time fix / repeat visit | Compare repeat tickets for the same asset/fault within an agreed window. | Linked service history, fault family, parts used, technician notes and closure evidence. |
| Spare-part availability | Compare ticket demand with available-to-promise stock by location and criticality. | SKU master, stock snapshots, reservations, min/max, open POs and transfer records. |
| Parts issue and return | Compare standard / allowed quantity, issue, fitted quantity, unused return and ticket closure. | Material issue slip, technician consumption record, store receipt and work order. |
| Procurement premium | Compare actual purchase price with matched approved reference price for identical specifications. | PO, supplier invoice, part specification, quantity, freight and urgency reason. |
| Warranty / recovery | Compare eligible claims with claims submitted, accepted and credited. | Purchase / warranty terms, serial/lot details, service diagnosis, claim submission and credit note. |
| Chargeable work billing | Compare work completed and parts consumed with contract scope and invoice. | AMC exclusions, customer approval, job completion, rate card, invoice and receipt. |
| PM completion and renewals | Compare due visits with completed visits and link service quality to renewal exposure. | PM plan, completed visit proof, SLA credits, renewal dates and contract margin. |
Eight sources of annual addressable economic leakage
The eight modeled opportunity streams total ₹132.00 lakh per year. Capture assumptions produce ₹100.50 lakh in annualized integration benefit at steady state. Priority classifications are qualitative scenario priorities, not independent risk ratings.
Unbilled chargeable repairs and spare parts
Critical · source prioritizationRoot cause: Completed repairs and parts consumption were not consistently joined to AMC scope, exclusions, customer approval, rate card and invoice status.
Business effect: Chargeable work can remain unbilled or disputed after service completion.
Control: Ticket-to-contract-to-invoice validation, rate cards, approval and pre-invoice exceptions.
Evidence boundary: ₹42.86L gross billable gap × 70% contribution margin = ₹30L contribution pool. Capture contribution only.
Warranty / supplier recovery gaps
High · source prioritizationRoot cause: Warranty and supplier-recovery evidence was not tracked from eligibility through submission, supplier response and credit.
Business effect: Recoverable value can age or be missed; claim value is not cash until accepted and credited.
Control: Claims register linked to part, asset, supplier, purchase and job evidence.
Evidence boundary: Eligible amount after contract, proof and supplier acceptance. Recognize recovery only after documentary acceptance or credit.
Repeat visits / first-time-fix rework
High · source prioritizationRoot cause: Fault and service history, parts availability, technician notes and repeat-call reasons were not consistently linked.
Business effect: Revisit labour, vehicle and handling costs can persist when first-visit resolution is weak.
Control: Fault / part history, availability by location, reservation and pre-dispatch checks.
Evidence boundary: Incremental revisit labour, vehicle and handling; parts already counted elsewhere are excluded. Route-only idle travel is treated separately.
Emergency spare procurement and freight premiums
High · source prioritizationRoot cause: Critical-part availability, replenishment thresholds, lead times and comparable purchase references were not visible together.
Business effect: Emergency purchase and freight premiums can rise when normal replenishment or transfers are not triggered early enough.
Control: Criticality-based min/max, approved supplier references, reorder alerts and transfer visibility.
Evidence boundary: Matched part specification, approved price and comparable freight; normalize genuine urgency and specification differences.
Spare over-issue, variance and dormant-stock loss
High · source prioritizationRoot cause: Standard versus actual issue, authorization, fitted quantity, unused return and location balances were not reliably reconciled.
Business effect: Excess issues and unexplained variance can create loss, while low-use stock can tie up cash in the wrong location.
Control: Ticket-linked standard / actual issue, return, cycle-count, redeployment and stop-buy controls.
Evidence boundary: Excess issue and unexplained variance net of returns / redeployment. Working-capital release is kept separate.
Missed PM windows and SLA service credits
High · source prioritizationRoot cause: Due dates, completion evidence, overdue reasons and contract-specific SLA exceptions were not surfaced in one accountable workflow.
Business effect: Avoidable credits, deductions and directly attributable service costs can increase customer and contract exposure.
Control: Due-date calendar, overdue queue, proof of completion and account-level escalation.
Evidence boundary: Count only avoidable credits, deductions and directly attributable costs; verify the contract SLA and service evidence.
Technician routing and overtime inefficiency
Medium · source prioritizationRoot cause: District routing, travel gaps, open workload and overtime allocation depended on manual dispatcher knowledge.
Business effect: Non-revisit travel inefficiency, idle gaps and avoidable overtime can reduce available field capacity.
Control: Dispatcher-assisted allocation and route-exception reporting by district, skill and workload.
Evidence boundary: Exclude repeat-visit costs counted in the first-time-fix stream. Use approved route, attendance and overtime evidence.
AMC renewal contribution at risk
Medium · source prioritizationRoot cause: Service history, repeat calls, PM completion, customer outcomes and renewal dates were not connected in one renewal-risk view.
Business effect: Contract renewal contribution can be at risk when service-quality issues are not visible early enough for account action.
Control: Service history, PM completion, repeat-call indicators and renewal-risk dashboard.
Evidence boundary: Contribution component of ₹25L gross AMC contract value at risk; 48% contribution-margin assumption.
| Leakage stream | Annual opportunity | Capture assumption | Annual integration benefit |
|---|---|---|---|
| Unbilled chargeable repairs / parts | ₹30.00L | 80% | ₹24.00L |
| Warranty / supplier recovery | ₹12.00L | 75% | ₹9.00L |
| Repeat visits / first-time-fix rework | ₹20.00L | 75% | ₹15.00L |
| Emergency spare procurement / freight | ₹18.00L | 75% | ₹13.50L |
| Spare over-issue / variance / dormant stock | ₹16.00L | 75% | ₹12.00L |
| Missed PM windows / SLA credits | ₹12.00L | 75% | ₹9.00L |
| Technician routing / overtime | ₹12.00L | 75% | ₹9.00L |
| AMC renewal contribution at risk | ₹12.00L | 75% | ₹9.00L |
| TOTAL | ₹132.00L | 76.1% weighted | ₹100.50L |
From service leakage to measurable operating value
The native explorer is the interactive companion. Select an opportunity stream to inspect its financial pool, capture assumption, root cause, business effect, calculation basis, control and evidence boundary.
Unbilled chargeable repairs and spare parts
Root cause
Completed repairs and parts consumption were not consistently joined to AMC scope, customer approval, rate card and invoice status.
Business effect
Chargeable work can remain unbilled or disputed after service completion.
Calculation basis
₹42.86L gross billable gap × 70% contribution margin = ₹30.00L contribution pool; × 80% capture = ₹24.00L.
Control introduced
Ticket-to-contract-to-invoice validation, rate cards, approval and pre-invoice exceptions.
Evidence boundary
Count contribution only after scope, evidence, customer approval, rate card and invoice checks. Gross billing remains a separate disclosure.
Protecting billable service value and AMC contribution
Chargeable service revenue and AMC contract value are shown separately from their contribution components. Only the modeled contribution values below are included once in the ₹100.50L annualized integration benefit.
Building a connected service and spare-parts operating environment
The solution is an SME-scale integration and operating-control layer. It can use existing accounting exports, spreadsheets and approved interfaces as source systems. It does not require an enterprise-wide platform replacement or autonomous control of elevator equipment.
Asset and contract source
One asset / customer / contract reference.
- Asset ID and building
- Lift type and location
- AMC tier and scope
- SLA, renewal and history
Service request and ticket
Structured service-event capture.
- Request intake and asset lookup
- Priority and SLA clock
- Symptom and job status
- Closure evidence
Dispatch and field execution
Dispatcher-assisted allocation visibility.
- Technician availability
- Territory and skill tags
- Open workload and priority
- Part reservation visibility
Spare-parts and inventory
Stock linked to the service requirement.
- SKU and approved references
- Criticality and location
- Min/max and lead time
- Issue, return and consumption
PM and warranty workflows
Scheduled work and eligible claims.
- PM calendar and due windows
- Completion proof and overdue alerts
- Warranty eligibility
- Claim ageing and status
Commercial control
Validate work before billing and renewal review.
- AMC scope and exclusions
- Chargeable approval
- Parts consumed and rate card
- Invoice completeness
Management intelligence
Owner-led performance and exception views.
- Daily open-ticket / SLA view
- Weekly PM / inventory exceptions
- Monthly value ledger
- AMC renewal dashboard
Exception feedback loop
Validated outcomes feed operating rules.
- Overdue alerts
- Reorder thresholds
- Claim ageing
- Renewal risk and owner actions
From asset master to controlled service deployment
The six-phase sequence stabilizes asset and spare-part data first, then connects service and inventory events, and finally introduces management reporting and value tracking. This is an indicative schedule, not a guarantee for every real customer.
Discover and baseline
Confirm service processes, asset / AMC sources, ticket channels, SKU catalogue, store locations, source owners, definitions and evidence rules.
Deliverable: Process map and baseline register.Exit: Signed baseline, source-to-metric map and prioritized backlog.
Owner: Service operations owner.
Master-data foundation
Normalize asset IDs, customer/site references, AMC scope, part codes, criticality, approved suppliers, min/max and store mappings.
Deliverable: Validated asset / AMC and parts masters.Exit: Reconciliation and data exception log.
Owner: Data steward with store owner.
Service and PM workflow
Configure structured ticket fields, ticket status, SLA timestamps, PM due windows, overdue alerts, technician assignment queue and closure proof.
Deliverable: Ticket and PM workflows.Exit: UAT for intake, dispatch and PM workflows.
Owner: Service operations owner.
Parts and commercial controls
Connect reservation, issue / return, procurement receipts, reorder alerts, warranty evidence, chargeable-work approval and pre-invoice checks.
Deliverable: Parts, warranty and billing registers.Exit: Reconciled parts flow, exception queue and billing test pack.
Owner: Store owner and Finance / billing owner.
Reporting and pilot
Build service, SLA, PM, inventory, warranty, billing and renewal dashboards; pilot with selected districts and depots.
Deliverable: Management views and pilot rhythm.Exit: Dashboard sign-off, data-quality checks and defect log.
Owner: Departmental process owners.
Deployment and value tracking
Configure role-based access, release SOPs, orient users, go live with owner escalation and conduct the first benefits review.
Deliverable: Go-live pack, SOPs and monthly value ledger.Exit: Go-live sign-off and 30-day action plan.
Owner: Service operations owner with Mantis Predict delivery lead.
Core implementation deliverables
- Asset and AMC master with unique identifiers, contractual scope and renewal dates.
- Spare-part catalogue with standard descriptions, criticality, approved references, replenishment parameters and supplier lead times.
- Structured ticket workflow with severity, SLA timestamps, assigned technician, part reservation, work-completion record and billing / warranty pathway.
- Preventive-maintenance calendar with due windows, overdue tasks, completion evidence and account-level exceptions.
Parts, claims and management deliverables
- Parts issue, return and consumption controls linked to ticket / asset; purchase receipts, emergency-order flags and stock availability by location.
- Warranty and chargeable-work registers with evidence links, claim / billing status and ageing.
- Management dashboard and monthly value-realization ledger separating gross billings, contribution, avoided cost, working capital and capacity.
Adoption and governance ownership
A named service operations owner, store owner, Finance / billing owner and data steward should own the workflows. Departmental process owners manage exception resolution and escalation; the Mantis Predict delivery lead coordinates integration, validation, operating definitions and value reporting. Role-based access, documented exception ownership and SOP adoption are required. No training statistics or team-working-photo claims are made in this scenario.
Service quality, parts availability and productivity
The post-intervention scorecard compares control totals and direct time measures. Rate improvements are expressed as percentage-point changes; time and workload changes remain in their own units.
| Measure | Before | After / monitored state | Change | Interpretation |
|---|---|---|---|---|
| First-visit fix rate | 68.0% | 85.1% | +17.1 pp | More calls resolved without a repeat visit. |
| Revisit incidence | 32.0% | 15.1% | −16.9 pp | Fewer tickets require another visit. |
| Response SLA compliance | 81.0% | 95.1% | +14.1 pp | Better visibility into response deadlines and escalation. |
| PM visits completed within window | 82.0% | 95.0% | +13.0 pp | More scheduled visits completed in the agreed window. |
| Critical spare availability | 87.1% | 96.0% | +8.9 pp | Higher availability across critical SKU-location combinations. |
| Inventory record accuracy | 91.2% | 98.5% | +7.3 pp | Improved agreement between book and sample count. |
| AMC renewal rate | 84.0% | 92.0% | +8.0 pp | Improved renewal visibility and follow-up. |
| Average ticket resolution | 18.5 hours | 9.2 hours | 9.3 hours faster | Faster ticket closure in the modeled sample. |
| Average emergency response | 5.6 hours | 2.7 hours | 2.9 hours faster | Improved dispatch and priority visibility. |
| Process / admin effort | 520 h/month | 350 h/month | 170 h/month freed | 1.13 FTE equivalent capacity per year; not automatic payroll savings. |
Operational Performance Explorer
Select any KPI to inspect its baseline, post result, correct unit, supported denominator and interpretation. Percentage measures use percentage bars; time and effort measures use separate time scales. Shorter bars indicate improvement for lower-is-better measures.
First-visit fix rate
Share of service tickets resolved on the first visit.
Sample / denominator: 1,346 / 1,980 baseline tickets; 842 / 990 post tickets.
| Workflow | Baseline h/month | Post h/month | Hours recovered / month |
|---|---|---|---|
| Service ticket creation and closure | 125 | 75 | 50 |
| PM planning and follow-up | 95 | 55 | 40 |
| Parts issue, return and reconciliation | 95 | 55 | 40 |
| Warranty / AMC claim administration | 70 | 55 | 15 |
| Technician allocation and route changes | 80 | 65 | 15 |
| Management reporting and reconciliation | 55 | 45 | 10 |
| TOTAL | 520 | 350 | 170 |
One operating view across service, parts and customer contracts
The dashboard connects operating outcomes to the signals, ownership and review actions that management needs. Select a panel to inspect the relevant indicators and controls. This is a native scenario view, not a live service-management system.
Connected asset, AMC, ticket, technician, spare-parts, warranty and billing view
MODELLED POST STATE · NOT LIVE SERVICE DATA
Protect the response and first-visit service outcome
Link ticket intake to asset history, priority, contract SLA, technician assignment, work completion and repeat-call cause so service leaders can see where resolution is delayed.
| Exception | Asset / ticket / part reference | Department / owner | Priority | Ageing basis | Next action | Closure evidence |
|---|---|---|---|---|---|---|
| High-priority ticket / response SLA risk | Asset ID + ticket ID | Service coordination / service operations owner | High | Elapsed time from request / acknowledgement against contract SLA | Validate ticket priority, acknowledge and assign dispatcher / technician | Timestamped acknowledgement, dispatch and customer status |
| PM visit outside agreed service window | Asset ID + AMC ID | Service planning / PM coordinator | High | Elapsed time from contracted PM due window | Confirm visit status, completion proof and follow-up owner | Completed PM record and customer acknowledgement |
| Critical spare below min / max threshold | SKU ID + store / depot ID | Stores / store owner | High | Elapsed time since threshold breach or stock-out alert | Check ticket reservations, inter-depot availability and open PO | Count, transfer, approved PO or replenishment receipt |
| Parts issue / return mismatch | Ticket ID + SKU ID | Stores and service / process owner | High | Elapsed time since work completion or return due date | Reconcile issued, fitted and unused-return quantities | Authorized issue record, technician consumption and store receipt |
| Warranty / supplier claim awaiting response | Part serial / lot + claim ID | Procurement / warranty administrator | High | Elapsed time since eligibility or claim submission | Validate claim pack and follow up supplier response | Accepted claim, supplier credit or documented rejection |
| Completed chargeable work not matched to invoice | Ticket ID + AMC / contract ID | Finance / billing owner | Critical | Elapsed time since job completion and approval | Check contract scope, exclusions, customer approval, rate card and parts | Invoice reference or documented contractual exclusion |
| AMC renewal risk requiring account review | Asset ID + AMC ID | Customer / contract owner | Medium | Time remaining to contract renewal date | Review PM completion, repeat calls and service history with account owner | Recorded renewal decision and customer follow-up |
Critical-part availability and inventory discipline
Parts control connects criticality, stock location, service-ticket reservation, issue and return, replenishment parameters and approved supplier lead times. The goal is to make required parts visible before dispatch while keeping stock levels and redeployment decisions evidence-led.
The ₹32.00L amount is a candidate liquidity release, not operating profit, revenue or guaranteed cash. Dormant stock is not automatically obsolete or a loss. Each action needs SKU criticality, age, condition, demand, transfer compatibility, approved part reference and supplier return-term validation.
Ongoing service intelligence and continuous improvement
The ongoing operating model is more than software support. It is a recurring service, inventory, commercial and management-control rhythm that keeps exceptions visible as the installed base, parts catalogue, supplier terms, technician capacity and customer contracts change.
Protect active service delivery
- High-priority service tickets.
- Response SLA breaches.
- Critical-part stock-outs.
- Overdue PM work.
- Open repeat-call tickets.
- Parts unavailable for scheduled work.
- Chargeable-work approval exceptions.
- Unsubmitted warranty claims where evidence is available.
Resolve recurring operational exceptions
- Technician workload and district coverage.
- Repeat tickets and parts consumption exceptions.
- Emergency purchase and warranty claim ageing.
- PM completion and overdue work.
- Stock transfers and unresolved service exceptions.
Review performance and value
- Service margin and chargeable billing completeness.
- Warranty / supplier recovery.
- AMC renewal pipeline.
- Inventory health and spare availability.
- SLA performance and exception closure.
- Evidence-linked monthly value ledger.
Refresh operating rules
- Critical-part parameters and min/max levels.
- Service-process definitions and escalation rules.
- Dashboard owners and recurring exceptions.
- AMC renewal / service-risk indicators.
- Technician allocation and district workload.
- SOPs and control thresholds.
Value maintained through integration and new exceptions resolved
The monthly view keeps the integration benefit equivalent separate from the additional modeled value generated by new exceptions resolved under ongoing monitoring.
₹100.50L annualized ÷ 12
Customer service outcomes and capacity returned to the business
The connected operating model provides management with a clearer connection between service performance, preventive maintenance, parts readiness, warranty and chargeable-work evidence, AMC renewal visibility and the administrative effort involved in running the service operation.
BUILD A MORE CONNECTED SERVICE OPERATION
Start with an asset, service and spare-parts operating diagnosticUnderstand where service visibility, parts availability, PM control, warranty recovery and chargeable-work processes are constraining performance—and what a connected operating model could improve.