CASE STUDY 07 • PRECISION ENGINEERING & TOOLING

Building a Real-Time Production Monitoring System for a Precision Tooling SME

Business leakage diagnostic → Machine & job-card integration → Production intelligence

Annual economic opportunity identified₹134.00 LAKHSeven screened, non-overlapping opportunity streams.
Annualized integration benefit₹94.20 LAKHModeled at steady state from stream-specific capture assumptions.
Total operating value monitored₹9.00 LAKH / MONTH₹7.85L integration equivalent + ₹1.15L additional exception value.
Productive capacity released170 HOURS / MONTH2,040 hours/year · approximately 1.13 FTE equivalent.
Precision engineering and tooling workshop with CNC and VMC machining, inspection context and business outcome metrics.
Precision engineering and tooling production environment · Machine, job-card, tooling and inspection visibility connected into one operating view.
OEE58.5% → 69.8%+11.3 percentage points
First-pass yield93.2% → 97.4%+4.2 percentage points
Unplanned downtime12.8% → 8.1%−4.7 percentage points
Schedule adherence72% → 91%+19.0 percentage points
On-time delivery78% → 93%+15.0 percentage points

Executive Summary

CASE OVERVIEW

A growing precision engineering and tooling business was handling a high-mix, low-volume order book across CNC turning, VMC, milling, EDM, wire-cut and grinding processes. Its workflow connected customer drawings and revisions, quotation assumptions, job cards, routing, machine availability, tool issues, inspection, rework, maintenance and dispatch—but the information was fragmented across job-card sheets, operator entries, machine logs, tool records, maintenance files and spreadsheets.

Management could see that jobs were late, machines were waiting and tool costs were rising, but it could not reliably connect each loss to the machine, job, tool, reason code, cost and accountable owner. Short stoppages were often invisible in manual records; setup time and actual cycle time were not consistently compared; quality losses were detected after work had moved downstream; and current job status was difficult to establish without asking several people.

The modeled transformation introduces a lightweight production-monitoring and operating-intelligence layer around the existing accounting and machine environment. It standardizes job-card and machine identifiers, captures approved machine signals and event codes, digitizes job-card progress, links tool-life and inspection records to jobs, structures maintenance closure and converts the resulting data into shift, daily and monthly dashboards. The scope is analytics and workflow integration—not replacement of CNC controls or engineering judgement.

THE RESULT, UPFRONT

₹134.00L is the annual opportunity pool. Stream-specific capture assumptions produce ₹94.20L of annualized integration benefit at steady state, equivalent to ₹7.85L/month. A separate ₹1.15L/month modeled assumption for new exceptions resolved under ongoing monitoring brings total monthly operating value monitored to ₹9.00L. The model also releases 170 process hours per month and improves OEE from 58.5% to 69.8%.

STAGE 01 · COMPANY PROFILE & OPERATING CONTEXT

The Business at a Glance

OPERATING PROFILE

A Maharashtra precision-engineering and tooling SME serving recurring B2B customers with bespoke components, tooling elements, fixtures, jigs, dies and precision-machined parts. The business competes on dimensional accuracy, repeatability, engineering responsiveness and delivery reliability across a changing mix of small and medium-sized jobs.

INDUSTRY / BUSINESS MODELPrecision engineering

High-mix, low-volume B2B job shop serving customer-specific component and tooling requirements.

PRODUCTION ENVIRONMENTMixed-age machine estate

CNC turning, VMC, milling, EDM, wire-cut, grinding and finishing processes within one production site.

PRODUCT / JOB FAMILIESTooling & precision parts

Bespoke components, tooling elements, fixtures, jigs, dies and precision-machined parts.

OPERATING WORKFLOWDrawing to dispatch

Revision control, quotation, routing, material allocation, job-card release, machine operations, tooling, inspection and final dispatch.

INFORMATION ENVIRONMENTConnected through a data layer

Accounting exports, Excel job cards, operator entries, controller/PLC data where available, tool records, quality sheets and maintenance files.

Numeric profile dimensionScenario valueOperating interpretation
Annual turnover₹24 croreSME scale assumption.
Employees48Operating team profile.
Operating footprint1 production siteMaharashtra production site.
CNC / VMC / milling centres8 machinesMachining-centre population.
EDM / wire-cut machines2 machinesElectrical discharge / wire-cut processes.
Grinding / finishing machines2 machinesFinishing and precision-grinding processes.
Total monitored machine assets12 machines8 machining centres + 2 EDM / wire-cut + 2 grinding / finishing.
Active tooling / component families65 familiesProduct and component range.
Recurring B2B customers22 customersRecurring customer base.
Baseline job-card activity1,560 records / yearScenario activity scale; not the detailed sample register.
Post-period job-card activity780 records / 6 monthsPost-period activity assumption.
Population distinction: Annual job-card activity is modeled at 1,560 baseline records/year and 780 post-period records over six months. The detailed transaction samples are separate: 600 baseline job-card records and 300 post-period records.
STAGE 02 · BUSINESS SITUATION BEFORE INTEGRATION

How the Workshop Operated Before Production Integration

CURRENT STATE

The operating flow began with a customer inquiry, drawing and revision, followed by quotation, job acceptance, route planning, material allocation and job-card release. Work then moved across machines and inspection stages. Tool changes, small stops, breakdowns, rework, program changes and urgent jobs affected the sequence; dispatch depended on completion of final inspection and documentation.

Customer drawing & revision→Quotation & job acceptance→Route plan & material→Job-card release→Machine operations→Tooling & inspection→Rework / approval→Final inspection & dispatch
ACCOUNTING / ERPCommercial records

Customer, quotation, purchase and accounting exports.

JOB CARDS / ROUTINGManual updates

Excel job cards, route sheets, planned hours and actual hours.

MACHINE SIGNALSMixed sources

Controller/PLC data where available, operator entries and manual event logs.

TOOL / QUALITYSeparate registers

Tool issue slips, replacement reasons, inspection sheets and rework notes.

MAINTENANCEWork-order files

PM schedules, corrective work, subsystem history and closure status.

DISPATCHLate-stage visibility

WIP, inspection hold and agreed delivery status consolidated after the shift.

  • Planned machine, standard hours, actual hours and remaining work were not always visible together.
  • Stoppages under one or two minutes were inconsistently recorded, leaving recurring micro-stoppages as unexplained output loss.
  • Tool issues and replacements were not consistently linked to the job, machine, observed life and approved reference life.
  • Inspection and rework were stored separately from machine and job data, weakening first-pass yield and cost-of-poor-quality analysis.
  • PM scheduling and corrective work-order closure were not connected to current utilization and condition signals.
  • WIP, bottleneck capacity and inspection holds were not visible in one operating view, so delivery risk was discovered late.
Before-integration shop-floor visibility diagram showing job cards, machine events, tool issues, quality and rework, maintenance and dispatch disconnected from a common job-and-machine view.
Before integration — job cards, machine events, tool issues, quality, maintenance and dispatch existed as separate information islands.

The issue was not an absence of information. It was the absence of a dependable operating record connecting machine events, job progress, tool condition, quality, maintenance and delivery to a common job and asset identity.

STAGE 03 · CRITICAL BUSINESS PROBLEMS

The Production and Job-Control Problems

SEVEN PROBLEM CLUSTERS
01 · MACHINE VISIBILITYShort stops and runtime loss

Micro-stoppages, utilization and runtime were not captured consistently at event level, weakening OEE diagnosis and loss attribution.

02 · JOB CARD / ROUTINGPlanned versus actual work

Machine plan, route sequence, planned hours, actual hours and current job status sat in separate records, creating schedule slippage and expediting.

03 · TOOL LIFEUncertain replacement decisions

Tool consumption was not systematically compared with approved life and condition records, increasing the risk of premature replacements and emergency purchases.

04 · QUALITYDelayed defect feedback

Inspection, rejection and rework were not joined to operation and tool state, allowing defects to move downstream and recurring causes to remain hard to isolate.

05 · MAINTENANCEDisconnected PM and corrective closure

PM due dates, corrective work, condition signals and machine history were disconnected, contributing to repeat breakdowns and delayed closure.

06 · ENERGY / CONVERSION COSTLimited operating normalization

Machine output and energy-use records were not consolidated by period and production context, limiting specific energy and conversion-cost visibility.

07 · DELIVERY CONTROLLate WIP and customer-risk visibility

WIP, machine loading, inspection hold and dispatch status were not consolidated, increasing late-delivery recovery cost and customer pressure.

STAGE 04 · OBSTACLE ANALYSIS

What Prevented Management from Resolving These Problems

ROOT CAUSE → CONTROL
ObstacleRoot causeAffected functionBusiness consequenceRequired data / control
No common machine and job-card identifiersSeparate asset, job and operation references.Production / planningMachine events cannot be reliably attributed to a job.Common machine, job-card and operation IDs.
Manual job-card status updatesStatus updated after the event or by follow-up.Planning / dispatchCurrent WIP and due-date risk are unclear.Timestamped job progress and route status.
Incomplete micro-stoppage captureShort stops often omitted from manual records.Production / maintenanceRecurring availability loss is hidden.Approved event capture and reason codes.
Different controller formats12 assets have mixed data-source availability.Engineering / maintenanceSignals cannot be treated as identical.Per-machine source map, validation and source label.
No consistent tool-life reference reviewIssue, observed life and approved life are not consistently linked.Stores / production engineeringPremature replacement and avoidable tool cost.Job/machine-linked tool records and engineering approval.
Tool issue disconnected from job costingTool slips do not carry a common job and operation reference.Stores / financeTool consumption is difficult to attribute.Tool issue/return and purchase record linkage.
Quality records separate from operation contextInspection results are not tied to machine/job/tool state.Quality / productionDefects and rework causes surface late.Operation-level inspection and reason codes.
PM and corrective closure separatedWork orders do not connect to utilization and machine history.MaintenanceRepeat failures and delayed closure.PM due queue, asset history and closure evidence.
WIP and delivery risk hidden at shift levelMachine loading and inspection hold are not consolidated.Planning / dispatchLate recovery action and customer pressure.Job-card WIP, bottleneck and due-date risk view.
Inconsistent reason codes and manual reportingDefinitions and ownership vary across functions.Management / all functionsSlow consolidation and inconsistent action.KPI dictionary, owner queues and audit trail.
Why a full-scale MES was not assumed: The scope is deliberately SME-scaled. It prioritizes common machine and job identifiers, scheduled data capture, event reason codes, controlled job-card updates, tool and quality registers, maintenance closure and role-based dashboards—not a full MES replacement, machine-control redesign or factory-wide hardware replacement. Existing PLC/controller data can be reused where available; approved retrofit sensors or operator event capture may be used selectively, subject to engineering approval.
STAGE 05 · BASELINE DATASET & RECORD POPULATIONS

The Evidence Base — Records Used in the Diagnostic

BASELINE JAN–DEC 2025 · POST JAN–JUN 2026

The companion workbook contains a 12-asset machine master, sampled transaction registers and a separate outcome scorecard. Activity assumptions and detailed sample registers are kept distinct.

DatasetSample populationPrimary analysis
Machine master12 assetsMachine type, area, criticality and data-source mapping.
Baseline job-card log600 recordsCustomer, job family, material grade, machine, planned/actual hours, status and due date.
Post job-card log300 recordsPost-period job progress, routing and delivery flags.
Baseline downtime log480 eventsEvent date, machine, reason code, duration, capture source and owner.
Post downtime log240 eventsShort-stop visibility, event ownership and closure trend.
Tool consumption360 recordsTool category, approved reference life, observed life, cost and replacement reason.
Post tool use180 recordsTool-life and replacement-control sample.
Quality / rework360 baseline + 180 postInspected, rejected and reworked quantity with modeled unit-cost assumptions.
Energy / output144 baseline + 72 postEquivalent output, energy use and specific energy intensity.
Maintenance history180 baseline + 120 postPM/corrective status, labour hours, subsystem and owner.
Reporting time study6 workflowsSame process scope before and after.
1,560 / yearBaseline job-card activity assumption
780 / 6 monthsPost-period job-card activity assumption
600 / 300Detailed baseline / post job-card sample records
Measurement boundary: KPI scorecard figures are modeled assumptions and are not all directly aggregated from sample logs. OEE is formula-derived from availability, performance efficiency and quality rate. A live audit would reconcile each KPI to source transactions, machine histories, approved standards and agreed operating calendars.
STAGE 06 · DIAGNOSTIC INVESTIGATION

How the Production Monitoring Diagnostic Was Conducted

SEVEN EVIDENCE TESTS
A · DATA NORMALIZATIONSOURCE ALIGNMENT

Normalize job-card and machine data

Create common machine IDs, job-card IDs, customer IDs, operation codes and period definitions. Reconcile planned hours, actual hours, remaining work and job status.

  • Match job and machine records.
  • Validate period cut-offs and duplicate/missing references.
  • Separate activity assumptions from sampled rows.
B · MACHINE LOSSESEVENT ANALYSIS

Quantify machine losses

Compare planned production time, runtime, breakdown duration, setup/changeover, minor stoppages and reason-code distribution.

  • Separate setup from unplanned downtime.
  • Identify repeated short stops and owner function.
  • Link bottleneck hours to eligible job demand.
C · TOOL CONSUMPTIONLIFE / CONDITION REVIEW

Review tool consumption

Compare issue and replacement records with the approved tool-life window and investigate premature replacement or unrecorded consumption.

  • Compare approved reference and observed life.
  • Review replacement reason and tool cost.
  • Keep limits and decisions under engineering approval.
D · QUALITY LOSSCOST / CAUSE LINKAGE

Review quality and rework loss

Link inspected, rejected and reworked quantities to job, machine, operation and defect cause; exclude base cost and capacity already counted elsewhere.

  • Separate first-pass acceptance from rework.
  • Identify defect categories and ageing.
  • Use incremental material, labour and inspection cost.
E · PREMIUM COSTSNORMAL-COST BASELINE

Reconcile overtime and urgent subcontracting

Identify incremental premiums above normal job cost and ensure late-delivery freight is not duplicated.

  • Payroll premium and subcontract invoice match.
  • Determine normal-cost baseline.
  • Exclude base job cost.
F · ENGINEERING CHANGESAPPROVAL → INVOICE

Test approved changes and extra operations

Compare approved change orders, revised quotations, job-card additions and invoices. Count contribution only once.

  • Match change-order reference to added operations.
  • Validate customer approval and revised quotation.
  • Show gross invoice value separately.
G · DELIVERY RECOVERYCOMMITMENT / DISPATCH

Validate delivery recovery cost

Reconcile actual dispatch, freight, customer recovery and expedite charges to the agreed delivery date and root cause.

  • Screen overtime/subcontract overlap.
  • Exclude orders ultimately fulfilled later from downtime lost-demand calculations.
  • Record evidence, owner and action.
Machine utilization and downtime Pareto infographic across twelve anonymized machines showing downtime reasons, monthly trend, OEE and unplanned downtime outcomes.
Machine utilization and downtime analysis · 12-machine estate, with minor stoppages, breakdown, material wait, setup and inspection hold kept as distinct reason categories.
Machine & Downtime ExplorerWORKBOOK EVENT SAMPLES · FILTER BY MACHINE, CAUSE AND PERIOD
Events in selected sample480
Recorded duration—
Machine population12

Reason distribution

Select a machine or reason to explore the sampled event population.

Sample event records

EventDateMachineReasonHoursCapture sourceOwner
The event-level sample is available when the explorer initializes.

Event counts and durations are derived from the sampled workbook rows. They are not a complete plant downtime ledger and are distinct from the modeled 12.8% → 8.1% KPI scorecard result.

STAGE 07 · FINANCIAL OPPORTUNITY & CAPTURE

Seven Sources of Annual Addressable Production and Margin Opportunity

₹134.00L → ₹94.20L

The seven streams are screened for overlap and categorized by economic type. Contribution opportunity from constrained capacity and approved scope changes is kept distinct from direct cost reduction and avoided recovery cost.

Opportunity streamAnnual opportunityCapture rateAnnual integration benefitValue type
Unplanned downtime / constrained capacity₹32.00L70%₹22.40LContribution opportunity
Setup and changeover loss₹24.00L65%₹15.60LContribution opportunity
Cutting-tool over-consumption / premature replacement₹18.00L75%₹13.50LDirect cost reduction
Rework and rejection cost₹22.00L70%₹15.40LDirect cost reduction
Overtime and urgent subcontracting premium₹16.00L70%₹11.20LIncremental premium reduction
Unbilled engineering changes / extra operations₹12.00L80%₹9.60LContribution opportunity
Late-delivery expediting / customer recovery₹10.00L65%₹6.50LAvoided recovery cost
TOTAL₹134.00L70.3% weighted₹94.20LSeven non-overlapping streams
Annual opportunity and modeled integration benefit waterfall for seven precision-engineering production loss streams, totaling ₹134 lakh opportunity and ₹94.20 lakh benefit.
Annual production-loss and contribution opportunity bridge · Gross engineering-change billing is disclosed separately; only captured contribution is included in the integration benefit.
Financial Opportunity ExplorerSELECT A STREAM TO INSPECT CAUSE, CAPTURE AND EVIDENCE
Annual opportunity₹134.00L
Annual integration benefit₹94.20L
Weighted modeled capture70.3%
Annual opportunity Integration benefit
CONTRIBUTION OPPORTUNITY

Unplanned downtime / constrained capacity

Opportunity₹32.00L
Capture70%
Benefit₹22.40L

Root causeShort stoppages, breakdowns and bottleneck hours were not consistently linked to scheduled production time, machine identity, job demand and contribution impact.

Diagnostic methodReconcile time-stamped machine state, scheduled production hours, stoppage reason, bottleneck confirmation and job demand.

Control introducedReason-coded event capture, recurring-stop review, machine-owner queue and verified lost-capacity-to-job-demand bridge.

Evidence requiredMachine event log, production calendar, job-card demand, dispatch status and contribution/hour assumptions.

Counting boundaryCount only verified productive capacity and eligible contribution. Exclude setup losses and delayed orders fulfilled later.

₹134.00L annual opportunity→₹94.20L annualized integration benefit
Weighted capture: ₹94.20L annual integration benefit ÷ ₹134.00L annual opportunity = approximately 70.3%. Capture rates are modeled assumptions, not guaranteed realized amounts.
STAGE 07 · REVENUE / CONTRIBUTION BOUNDARIES

Approved Engineering Changes and Downtime-Related Contribution

GROSS VALUE ≠ CONTRIBUTION

Capturing Approved Engineering Changes and Extra Operations

SEPARATE BILLING POOL
₹15.00LGross annual change / extra-operation billing pool
₹12.00LContribution opportunity inside that billing pool
80%Modeled contribution capture
₹9.60LCaptured contribution already included once in ₹94.20L

Additional operations require approved change orders, revised quotations, customer approval, job-card additions and invoice evidence. Gross invoice value is not contribution or profit, and the model does not infer that gross billing is cash collected.

Downtime, Gross Sales and Contribution

CONFIRMED UNFULFILLED DEMAND ONLY
Confirmed contribution opportunity₹28.00LAnnual contribution at risk from verified unfulfilled demand.
Contribution margin assumption20%Applied to the gross sales value at risk.
Gross annual sales value at risk₹140.00L₹28.00L ÷ 20% contribution margin.
Modeled integration capture65%Applied to the contribution opportunity.
Gross sales value protected₹91.00L₹140.00L × 65% capture; gross revenue, not profit.
Contribution protected₹18.20L₹28.00L × 65%; already included once in ₹94.20L.
No double counting: ₹91.00L is gross sales value protected, not profit. ₹18.20L is contribution protected and is already included once in the ₹94.20L annual integration benefit. Only confirmed orders that were not fulfilled due to bottleneck downtime are included; delayed orders fulfilled later are excluded.
STAGE 08 · CONNECTED PRODUCTION ARCHITECTURE

Building an Integrated Production-Monitoring Environment

FIVE LAYERS + GOVERNANCE

The target design connects existing job, machine, tool, quality, maintenance, energy and dispatch records into a single production-intelligence layer. It uses staged integration and approved data capture rather than assuming that all machines are new or that all controllers expose identical signals.

Precision tooling workshop production monitoring architecture connecting machine signals, job-card and routing data, tool and quality records, maintenance and energy to common IDs, validation, owner workflows and management dashboards.
Connected production-monitoring architecture · Common machine and job identifiers connect approved signals and operating records to event workflows and the production-intelligence cockpit.
01 · SOURCE

Source records

Job-card sheets, ERP/accounting exports, controller/PLC signals where available, tool issue, inspection, maintenance, energy and dispatch.

Output: source map, machine/job master and KPI definitions.
02 · DATA CAPTURE

Approved data capture

Machine events, shift entries, job status, tool-life and inspection updates with timestamps and source labels.

Output: reason codes, validation and missing-data alerts.
03 · INTEGRATION

Common identifiers

Machine, job card, operation, tool, customer and material IDs joined through scheduled imports, APIs or controlled file exchange.

Output: duplicate checks, audit trail and reconciled records.
04 · WORKFLOW

Exception ownership

Production status, downtime, setup, tool-life alerts, quality holds, PM due dates and delivery risk.

Output: owner queues, escalation thresholds and closure evidence.
05 · INTELLIGENCE

Management view

Shift cockpit, machine utilization, OEE, job-card WIP, first-pass yield, tool cost, energy intensity and OTIF.

Output: daily production review, weekly bottleneck review and monthly value ledger.
06 · GOVERNANCE

Operating guardrails

KPI dictionary, approval rights, access, SOPs, escalation, audit trail, engineering thresholds and monthly management review.

Output: repeatable ownership and controlled decision rights.
SME-scale technology choices: Reuse existing machine signals and network connectivity where practical; use approved retrofit devices only where the diagnostic justifies the gap. Use job-card/operator entry as a fallback when reliable signals are unavailable, with source and confidence labels. Engineering-approved tool-life limits, inspection tolerances, program revision and maintenance thresholds remain under client engineering ownership.
STAGE 09 · IMPLEMENTATION METHODOLOGY

How the Production Monitoring System Is Implemented

INDICATIVE 12-WEEK PLAN

The six-phase sequence starts with source mapping and a bounded pilot, then establishes the common data foundation, production capture, workflow controls and value review. Hardware procurement, PLC modification, machine retrofits, custom software and third-party connectivity may require separate feasibility and approval.

PHASE 01 · DIAGNOSTIC & DESIGNWEEKS 1–2

Walk the process and define the pilot

Map the shop floor, source records, machine/job master, KPI and reason-code dictionary; select pilot assets and data sources.

  • Shop-floor walkthrough and source map.
  • Machine/job master and pilot asset selection.
  • Control owners and KPI definitions.
EXIT EVIDENCE: Signed baseline, pilot scope, source-to-metric map and control owners.
PHASE 02 · DATA FOUNDATIONWEEKS 3–4

Clean identifiers and establish refresh

Clean machine/job identifiers, connect approved exports, define timestamp and event rules, and build initial sample dashboards.

  • Master-data alignment.
  • Approved data import and duplicate checks.
  • Timestamp and event capture rules.
EXIT EVIDENCE: Validated master data and repeatable data refresh.
PHASE 03 · PILOT CAPTUREWEEKS 5–7

Test machine, job and tool events

Pilot selected machines; capture job status, minor stops, setup and tool events, then verify against shift records.

  • Selected machines and job-card routes.
  • Minor-stop, setup and tool-event capture.
  • Reconcile against shift records.
EXIT EVIDENCE: Reconciled pilot data and exception evidence.
PHASE 04 · WORKFLOW BUILDWEEKS 8–9

Build owner queues and KPI views

Add job-card queues, tool-life review, maintenance and quality closure, schedule-risk views and dashboards.

  • Job, tool and quality workflow.
  • PM and corrective closure.
  • Owner, severity and evidence rules.
EXIT EVIDENCE: UAT sign-off, tested owner queues and KPI calculations.
PHASE 05 · DEPLOYMENTWEEKS 10–11

Scale to agreed remaining assets

Scale approved capture to remaining assets, publish SOPs, implement data-quality checks and role-based access, then go live.

  • Agreed machine population.
  • SOP and access controls.
  • Go-live checks and issue handling.
EXIT EVIDENCE: Go-live checklist, SOP set and defect/exception log.
PHASE 06 · VALUE REALIZATIONWEEK 12 ONWARD

Establish operating review and value ledger

Run daily/weekly operating reviews, maintain a monthly benefit ledger and prioritize the improvement backlog.

  • Baseline-to-post KPI bridge.
  • Monthly exception and value review.
  • Quarterly backlog prioritization.
EXIT EVIDENCE: Baseline-to-post KPI bridge and first monthly value review.
This is an indicative bounded integration plan, not a guaranteed 12-week implementation for every workshop. Hardware procurement, PLC modification, machine retrofits, custom development and third-party connectivity may require separate feasibility, engineering approval, scope and cost.
PRODUCTION INTELLIGENCE · NATIVE HTML DASHBOARD

Precision Production Cockpit

MANAGEMENT VIEW

A unified operating view connects machine state, job-card WIP, tooling, quality, maintenance and customer delivery. The embedded figure is the visual summary; the native dashboard below exposes the management lenses and sample-level source data.

Precision production cockpit dashboard with OEE, availability, performance, quality, schedule adherence, FPY, downtime, on-time delivery, utilization and job-card WIP views.
Real-time shift cockpit design · A management-facing summary of machine performance, production plan, WIP, late-job risk and customer delivery.
MANTIS PREDICT / CASE 07Production monitoring & operating intelligence

Machine, job, tooling, quality, maintenance and dispatch coordination

MODELED MANAGEMENT VIEW
NOT LIVE MACHINE TELEMETRY
OEE69.8%58.5% baseline
Availability89.5%84.5% baseline
Performance83.0%77.0% baseline
First-pass yield97.4%93.2% baseline
On-time delivery93.0%78.0% baseline
MACHINE PERFORMANCE

Production overview and fleet visibility

Review modeled OEE components alongside the 12-machine master, then use machine and event-level explorers to diagnose the reason behind utilization change.

OEE58.5% → 69.8%
Unplanned downtime12.8% → 8.1%
Schedule adherence72% → 91%
MachineMachine typeCriticalitySource availabilityBaseline availability
M-01CNC TurningHighManual event log80.8%
Dashboard values are tied to the scenario scorecard or labeled workbook sample records. This is not a live PLC connection, machine-control interface or autonomous production system.
TOOL LIFE & QUALITY INTELLIGENCE

Connecting Tool Consumption, Inspection and First-Pass Quality

TWO LINKED PANELS
Tool-life and quality intelligence dashboard comparing tool changes within approved life window, tool over-consumption opportunity, first-pass yield, inspection outcomes and rework cost.
Tool-life and quality intelligence · The system flags and analyses deviations; engineering and quality owners approve thresholds, tool changes and acceptance decisions.
Tool-Life & Quality ExplorerFILTER THE WORKBOOK SAMPLES · ENGINEERING / QUALITY AUTHORITY RETAINED

Tool-life panel

TOOL_ CONSUMPTION / POST_TOOL_USE
Records360
Sample tool spend—
Avg observed / approved—
Tool recordMachineCategoryApproved lifeObserved lifeCostReplacement reason
Tool-life sample records initialize when this explorer enters the viewport.

Quality / rework panel

QUALITY_LOG / POST_QUALITY
Records360
Rejected qty—
Reworked qty—
Quality recordJob cardMachineDefectInspectedRejectedReworkedSample cost
Quality sample records initialize when this explorer enters the viewport.

Tool-life and quality values above are record-level samples from the workbook. Approved life limits, condition interpretation, inspection tolerance and product acceptance remain under client engineering and authorized quality ownership.

STAGE 10 · OPERATIONAL RESULTS

Production, Machine Availability and Quality — Before and After

ELEVEN KPI MEASURES

The scorecard combines OEE components, delivery, quality, tool-life control and process effort. Each measure keeps its own unit and calculation definition.

Operational KPIBaselinePost / modeledChange
Availability84.5%89.5%+5.0 pp
Performance efficiency77.0%83.0%+6.0 pp
Quality rate89.9%94.0%+4.1 pp
Overall equipment effectiveness (OEE)58.5%69.8%+11.3 pp
Unplanned downtime12.8%8.1%−4.7 pp
Schedule adherence72.0%91.0%+19.0 pp
First-pass yield93.2%97.4%+4.2 pp
Tool replacement within approved life window62.0%88.0%+26.0 pp
Preventive maintenance completed on time71.0%94.0%+23.0 pp
On-time delivery78.0%93.0%+15.0 pp
Process / administrative effort360 h/month190 h/month170 h/month recovered
Operational before-and-after scorecard showing OEE, first-pass yield, schedule adherence, unplanned downtime, tool-life control, preventive maintenance, on-time delivery and 170 hours per month recovered.
Operational before-and-after scorecard · Cropped to the operating metrics and capacity result only.
Operational KPI ExplorerSELECT A KPI · BASELINE VS POST · DEFINITIONS AND UNITS
Machine and OEE
Production and delivery
Tool, quality and maintenance
Productivity
MACHINE & OEE

Overall equipment effectiveness (OEE)

Combined view of availability, performance efficiency and quality rate.

Baseline · 202558.5%
Post · Jan–Jun 202669.8%
+11.3 percentage points
Calculation definition

OEE = availability × performance efficiency × quality rate.

Measurement boundary

Formula-derived modeled scorecard value; not directly aggregated from the event samples.

BASELINE VS POST · SCALE 0–100%
58.5%
69.8%
Higher is better · percentage measure
STAGE 11 · PRODUCTIVITY & ONGOING MANAGEMENT

170 Hours of Productive Capacity Recovered Every Month

SIX WORKFLOWS

The time study compares the same six process and administrative workflows before and after integration. The result is capacity made available for higher-value work, faster throughput or reduced administrative burden.

CAPACITY RECOVERED170HOURS / MONTH2,040 hours/year · approximately 1.13 FTE equivalent at 1,800 hours per FTE/year.
WorkflowBaseline h/monthPost h/monthHours released
Job-card planning & dispatch703832
Machine status consolidation623428
Tool issue & life tracking482622
Quality / rework reporting583226
Maintenance coordination542826
Management reporting683236
TOTAL360190170
Capacity boundary: 170 hours/month × 12 = 2,040 hours/year; 2,040 ÷ 1,800 = approximately 1.13 FTE equivalent. This is productive capacity, not headcount reduction or payroll savings unless a cash cost is actually removed. The 36 hours/month management-reporting improvement is already included in the 170-hour total.

Monthly Operating-Value Bridge

NO PROVIDER-FEE DEDUCTION
Monthly integration-benefit equivalent₹7.85L₹94.20L annual integration benefit ÷ 12.
+
Additional modeled exception value₹1.15LNew monthly exception value under ongoing monitoring.
=
Total operating value monitored₹9.00LIncludes the ₹7.85L monthly integration equivalent.
₹9.00L/month includes the integration-benefit equivalent. It is not an additional benefit on top of ₹94.20L annualized integration benefit. The ₹1.15L/month is a separate modeled assumption that would require evidence in a monthly exception-closure ledger.

Ongoing Production Intelligence and Continuous Improvement

PROPOSED OPERATING RHYTHM
ROUTINE DATA REFRESH

Reconcile the operating record

  • Job-card progress and route status.
  • Machine events, downtime and setup.
  • Tool issue, replacement and approved life.
  • Quality, rework and inspection holds.
  • Maintenance, energy and dispatch.
DAILY / WEEKLY

Review machine and job losses

  • Top machine and job losses.
  • Hours lost and eligible contribution.
  • Repeated events and reason codes.
  • OEE components, loading and bottleneck changes.
  • Assigned owner and closure status.
WEEKLY / MONTHLY

Protect delivery, tooling and quality

  • WIP and due-date risk by job.
  • Tool-life exceptions and replacement cost.
  • Rework, rejection and disposition ageing.
  • PM overdue tasks and repeat failures.
  • On-time delivery and inspection holds.
MONTHLY / QUARTERLY

Maintain a value-led improvement backlog

  • Captured contribution and direct cost reductions.
  • Gross engineering-change billings.
  • Working-capital actions and productive capacity.
  • Open exceptions, owners and closure evidence.
  • Quarterly prioritization and KPI definition refresh.
Captured contributionVerified contribution from constrained capacity and approved extra scope.
Direct cost reductionTool, rework, overtime and other screened cost reductions.
Gross billingsEngineering-change invoice value, separate from contribution.
Working capitalOne-time WIP / tool-crib action, separate from P&L benefit.
Productive capacityHours released, not automatic payroll savings.

WIP and Tool-Crib Inventory — Candidate Working-Capital Release

SEPARATE ONE-TIME ACTION
₹22.00L
Candidate working-capital release

Modeled from excess WIP and tool-crib stock. The action requires job/lot/SKU-level validation, specification and demand checks, traceability, engineering approval and an approved disposition or purchase-reduction plan.

Separate from P&L profit, ₹134.00L annual opportunity, ₹94.20L integration benefit and ₹9.00L monthly operating value. It is not an automatic inventory write-off.

Before / Intervention / After — Operating Model Change

TRANSFORMATION SUMMARY
BeforeInterventionAfter / modeled outcome
Short stops and utilization were inconsistently recorded.Approved machine-signal capture, operator event entry and common machine IDs.OEE 58.5% → 69.8%; unplanned downtime 12.8% → 8.1%.
Planned/actual hours and job progress spread across separate records.Common job-card IDs, route updates and machine-level job status.Schedule adherence 72% → 91%.
Tool issue and replacement not consistently linked to approved life/condition.Tool records linked to machines, jobs and replacement reasons.Tool replacement within approved life window 62% → 88%; ₹13.50L modeled tool-cost benefit.
Inspection and rework separate from machine/job records.Operation-level inspection, rejection and rework linkage.First-pass yield 93.2% → 97.4%; ₹15.40L modeled conversion-cost benefit.
PM and corrective closure disconnected from machine history.PM due/overdue visibility and owner-based closure workflow.PM completed on time 71% → 94%.
WIP, bottleneck and inspection holds not consolidated.Job-status and delivery-risk queues.On-time delivery 78% → 93%.
360 hours/month across six workflows.Integrated data and structured production workflows.190 hours/month; 170 hours/month productive capacity recovered.
ENGINEERING & EQUIPMENT RESPONSIBILITY

Machine, Engineering, Tool-Life and Quality Decision Boundaries

QUALIFIED PERSONNEL RETAIN AUTHORITY

The production-intelligence layer supports visibility and workflow; it does not control machines or make engineering decisions.

The modeled scope includes approved data capture, machine and job visibility, event classification, production analysis, tool-life monitoring, quality reporting, maintenance coordination, dashboards and exception ownership.

It does not
  • Write commands to machine controls.
  • Change CNC parameters, spindle limits, feed rates or tooling parameters.
  • Modify machine interlocks or override safety systems.
  • Certify machines or determine product acceptance.
  • Prescribe tool-life thresholds or replace engineering judgement.
Client engineering / quality owners retain responsibility for
  • Machine settings, programs and process parameters.
  • Tool-life limits and tool replacement decisions.
  • Inspection tolerances and product acceptance.
  • Maintenance thresholds and equipment safety.
  • Machine retrofits, connectivity and security approvals.

Any retrofit sensor, PLC modification or third-party machine connectivity requires separate feasibility, engineering approval and security review. The analytics layer does not replace a full MES, machine control or authorized plant personnel.

CASE STUDY DISCLOSURE

Financial and Measurement Boundaries

PUBLICATION NOTE
Financial value

₹134.00L is annual opportunity; ₹94.20L is annualized integration benefit; ₹7.85L/month is its equivalent; ₹1.15L/month is separate new exception value; ₹9.00L/month includes the integration equivalent.

Gross billing and contribution

₹15.00L is the gross engineering-change invoice pool; ₹12.00L is its contribution opportunity; ₹9.60L captured contribution is already included once in ₹94.20L. ₹91.00L gross sales protected is distinct from ₹18.20L contribution protected.

Working capital and capacity

₹22.00L is a one-time WIP/tool-crib action candidate, separate from P&L benefit. 170 hours/month is productive capacity, not automatic payroll savings.

Operational measurement

OEE is availability × performance × quality. Sample event registers are not a full plant history. Tool-life limits, inspection tolerances, quality acceptance and machine signals require client engineering/quality validation.

BUILD A MORE CONNECTED PRODUCTION OPERATION

Start with a machine, job-card and production-performance diagnostic

Identify where machine visibility, job routing, tooling, quality, maintenance and delivery controls are constraining productive capacity—and where a connected production-intelligence layer can improve operating performance.

Book a 20-Min Call →